Introduction
Installation Checklist
Refer to the Hardware Description section of this guide for installation, setup, and operating information.
SCS-1R Faceplate
To lower the
Earth Ground
Connect the ground lug on the modem rack rear side to earth ground. Using a minimum of 14 gauge wire, ground to a cold water pipe, building ground, or a ground rod. Do not ground to electrical conduit or telephone company ground.
Location of Circuit Boards
Confirm the circuit boards in the modem rack and in the multibus rack are installed properly and are in their proper locations. The circuit boards are properly installed when completely seated into the connector on the rack backplane.
SCS-208 Power Cord
Connect the
Phone Lines
Connect the RJ11X cables provided with each line card to the phone lines used for receiving alarms.
Network Connection
When using a network interface card, connect the
AC Power
AC power input of the receiver is 120 VAC, 60Hz and at least 3.5 Amps outlet not controlled by a switch . Do not apply AC power yet. For listed operation, use a listed uninterrupted power supply (UPS). The UPS system must have a secondary power source (batteries) and provide alarm contacts to indicate when the UPS switches from primary power to secondary power. The
Optional Printer
Connect the
Note: UL central station applications must use a serial printer that is listed for Fire Protective Signaling Systems.
Start up
Apply 120 VAC to the AC power cord. The 120 volts supplied to the
Configuration
After powering up the system, set the correct time, configure the phone lines and network communications.
Note: Be sure that the Membrane Keypad is set to Address 01 (one). Refer to LCD Membrane Keypad Configuration for complete information.