Configuring and Controlling the Projector via a Web Browser

Schedule Settings (Continued)

The daily and weekly event items are shown below.

Item

Daily & Weekly Description

 

 

Schedule

Click the [Enable] check box to enable the schedule.

Schedule List

Displays the current schedule.

The specific date event items are shown below.

Item

Specific date (No.1-5) Description

Schedule

Click the [Enable] check box to enable specific date (No.1-5)

schedule.

 

 

 

Date (Month/Day)

Configures the month and day.

Schedule List

Displays the current specific date (No.1-5) schedule.

Click the [Apply] button to save the settings.

To add additional functions and events click the [Add] button and set the following items.

Item

Description

Time

Configures the time to execute commands.

Command

Configures the commands to be executed.

Parameter

 

 

Power

Configures the parameters for power control.

 

Input Source

Configures the parameters for input switching.

 

Display Image

Configures the parameters for display of transfer image data.

Click the [Register] button to add new commands to the Schedule List.

Click the [Delete] button to delete commands from the Schedule List.

NOTE • After the projector is moved, check the date and time set for the projector before configuring the schedules. Strong shock may make the date and time settings (15) get out of tune.

14

Page 80
Image 80
Dukane 8912-RJ Schedule Settings, Daily and weekly event items are shown below, Specific date event items are shown below