Component Temperature Measurement

Thermal Validation

 

 

Figure B-2 Thermally Significant Components—Primary Side

PMC 2

PMC 1

ABT/RST GigE 10/100 CPU BFL

ENET 1 ENET 2 COM1

J2

J1

J5

U1

 

 

J18

U29

J27

 

J8

 

U7

 

U19

U28

U30

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

U6

 

 

 

 

J21

J22

 

 

 

 

 

 

 

 

 

U5

U16

U25

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

U4

 

 

 

 

 

 

 

J102 - J110

XU2

 

XU1

 

 

 

 

 

1

 

 

 

 

 

P1

 

 

 

 

 

J23

J24

 

 

 

 

 

 

 

 

 

 

J102 - J110

 

 

3

 

 

 

 

 

 

 

S4

S3

 

 

 

 

 

 

U15

 

U18

U27

 

 

 

 

 

 

U23

 

 

 

 

 

 

 

U17

 

 

 

 

 

 

U14

 

U129

 

 

J11

 

J3

J32

P4

 

 

 

 

J6 / J100

 

 

 

 

 

 

J99

1

 

 

 

 

 

 

 

J98

U13

U12

 

 

 

 

 

J34

 

 

 

 

 

 

 

J12

J97

 

 

 

 

 

 

 

J101 / J7

 

 

U11

 

 

 

 

 

3

U3

U22

 

 

 

 

 

 

 

 

 

 

 

J33

 

 

 

 

 

J13

J14

 

 

U10

 

 

 

 

U2

 

 

 

 

 

 

 

 

 

U26

 

J32

 

 

 

 

 

 

 

 

 

 

 

 

U9

 

U20

 

 

 

 

 

 

 

 

U126

 

 

 

 

 

U8

 

U125

 

 

 

 

 

 

 

 

 

 

 

 

 

S2

 

 

S5

 

 

 

 

 

 

 

 

 

 

 

 

 

S1

 

 

 

 

 

 

 

 

 

U123

 

 

 

 

 

P2

 

 

 

 

 

 

 

 

 

 

 

U24

 

 

 

 

 

J28

 

 

 

 

 

U31

 

 

1

 

 

 

 

 

 

 

 

 

U124

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

J4

 

 

 

J28

 

4436 0207

B.3 Component Temperature Measurement

The following sections outline general temperature measurement methods. For the specific types of measurements required for thermal evaluation of this board, see Table B-1.

B.3.1 Preparation

We recommend 40 AWG (American wire gauge) thermocouples for all thermal measurements. Larger gauge thermocouples can wick heat away from the components and disturb air flowing past the board.

Allow the board to reach thermal equilibrium before taking measurements. Most circuit boards will reach thermal equilibrium within 30 minutes. After the warm up period, monitor a small number of components over time to assure that equilibrium has been reached.

MVME55006E Single-Board Computer Installation and Use (6806800A37D)

101

Page 101
Image 101
Emerson MVME55006E manual Component Temperature Measurement, Preparation