Mac OS X Integration WD029-1-1 2/24/2005

15.Select the start date (usually today), the start time (usually overnight when you are sleeping) and on which days to run the backup (usually every day). Select 1 week to have the schedule run every week. Select OK when you are done.

16.You should see the following dialog with your scheduled options. If this is correct, select the OK button.

17.You should now have a Duplicate dialog screen that looks like this, with a series of scheduled execution dates listed next to “Schedule”.

6325 Digital Way Indianapolis, IN 46278 317.616.6789 phone 317.616.6790 fax www.escient.com

Page 169
Image 169
Escient MP-150 manual Mac OS X Integration WD029-1-1 2/24/2005