PC Integration WD044-1-1 2/24/2005

7. The following dialog is displayed.

Note: If you want to turn off Verification, select Options and turn it off. Verification will verify that all files were backed up correctly, but will increase the overall backup time.

8.You can run the backup immediately by selecting the Duplicate button, or to schedule the backup to run every day, select the Schedule icon at the top of the toolbar (or just type Ctrl+S).

6325 Digital Way Indianapolis, IN 46278 317.616.6789 phone 317.616.6790 fax www.escient.com

Page 138
Image 138
Escient MP-150 manual PC Integration WD044-1-1 2/24/2005