68-1390-01
Installation Guide for the PVS 200, 300, and
PoleVault Systems
Rev. D
Consignes de Sécurité Français
Precautions
Safety Instructions English
Sicherheitsanleitungen Deutsch
Overview
PoleVault Systems Installation Introduction
Introduction
The PoleVault System
Introduction, contd
PoleVault System installation and wiring overview
1-2 PoleVault Systems Installation Introduction
Extron Cables & Notes
PoleVault Systems Installation Introduction - Planning
Before you Begin Installation - Planning
Typical classroom installation
1. Room layout
Introduction - Planning, cont’d
Example of a classroom installation
1-4 PoleVault Systems Installation Introduction - Planning
b. Location of the screen and projector
c. Location of MediaLink Controller and Wall Plates
Example classroom with four speaker installation
Viewing obstructions
Location of source devices
2. Inventory
1-6 PoleVault Systems Installation Introduction - Inventory Overview
Introduction - Inventory Overview
a. Included items
PoleVault System Devices and Hardware, cont’d
PoleVault Systems Installation Introduction - Inventory Overview
PoleVault System Devices and Hardware, contd
PVT CV D
PoleVault System Ceiling Speakers
1-8 PoleVault Systems Installation Introduction - Inventory Overview
Introduction - Inventory Overview, cont’d
PV SI 3C LP
Document camera and cables
b. Items not included
PoleVault Systems Installation Introduction - Inventory Overview
d. Installation tools
Introduction - Inventory Overview, cont’d
Stage One - Install the Screen and Projector
Installation Overview
Outline of installation steps
Stage Three - Install the PV SI 3C LP Ceiling Speakers
2-2 PoleVault Systems Installation Installation - Stage
Where it goes Screws up into PCM
Adjuster Plate
PCM 240 Projector Ceiling Mount
2c Install the PMP
When marking the center line of the screen
PMP installed onto PCM
2d Screw the adjuster plate onto the PMP
2-4 PoleVault Systems Installation Installation - Stage
Installation - Stage One, cont’d
2f Slide and lock the projector onto the adjuster plate
3. Verify the image location
4b Take measurements with the PCM 240 on the T-bar
installation
4. Cut the ceiling tile
Mark and start cutting the hole on the
6. Secure the Projector Ceiling Mount to the ceiling
6b Mark structural ceiling for lag bolt installation
2-6 PoleVault Systems Installation Installation - Stage
6a Attach turnbuckles at the corners
T Power outlet installation on the PCM
7. Install the Screen
6g Attach the safety cable to the PCM
T Use S-hooks to hang the screen from the brackets
2-8 PoleVault Systems Installation Installation - Stage
Stage Two - Install the Wall Plates and MLC 104 IP
This stage involves installing the devices shown below
Stage
PVS 204SA switcher
PVT transmitter installation
MLC 104 IP Plus installation
Cables
If a suitable wall box is already installed, follow step 2 onwards
Stage Two - Install the Wallplates and MLC 104 IP Plus
1. Install mud rings
T Use a level when marking the holes
T Secure cables with cable clamps to provide strain relief
Signal Cable
2. Pull cables
Label color
2-12 PoleVault Systems Installation Installation - Stage
Installation - Stage Two, cont’d
3. Install wall plates
3b Mount the PVT in the mud ring, then
Wire color
4. Install MediaLink Controller
TWire stripping lengths
4a Connecting the MLC to the switcher
Connect the MLC to the projector with
4c Connect to the LAN using a CAT 5 cable
2-14 PoleVault Systems Installation Installation - Stage
an RS-232 cable or IR emitter cable, as
2-15
Connections made to the MLC 104 IP Plus
4e Secure the MLC 104 IP Plus to the mud ring
PoleVault Systems Installation Installation - Stage
Speaker cable connects ceiling speakers to the PVS 204SA switcher
Stage Three - Install the PV SI 3C LP Ceiling Speakers
Speaker Installation
2-16 PoleVault Systems Installation Installation - Stage
1b Mark the tile and cut the hole
1. Cut ceiling tile
Measure and mark the center point of the tile and align
the cross marks with those on the supplied template
4. Cable the speakers
Installation - Stage Three, cont’d
2-18 PoleVault Systems Installation Installation - Stage
2e Turn and lock down the four dog legs on the C‑ring
Stereo or dual mono output using parallel speaker wiring
4-pole captive screw connector
4c Wire the captive screw connector Dual mono output
c. To terminate the cable, strip the end of the cable
5a Apply putty to speaker grill
5. Finish speaker installation
2-20 PoleVault Systems Installation Installation - Stage
Installation - Stage Three, cont’d
PVS 204SA PoleVault Switcher
Stage Four - Install the PMK 450 and the PVS 204SA
This stage covers installing the devices shown below
PoleVault Systems Installation Installation - Stage 4
Switcher and projector cable overview
Installation - Stage Four, cont’d
2. Install the PMK 450 Pole Mount kit
2-22 PoleVault Systems Installation Installation - Stage
power cord to the rear of switcher
3. Install the PVS 204SA switcher
to the cord of the supplied power source and connect the
3c Wire the captive screw connector for the power supply
FPower supply cable. Do not apply power yet
4. Finish installing the Pole Mount kit
BControl/power cable from the MLC 104 IP Plus
N Do not thread the power cable through the
PoleVault Systems Installation Installation - Stage 4
4d Replace projector on the adjuster plate
4c Attach and screw down rear plate
1a Load Global Configurator 2 software
Stage Five - Configure the System
1. Configure the system
1c Launch the Global Configurator 2 program
PoleVault Systems Installation Installation - Stage
Select MLC 104 IP Plus/PoleVault System from the drop down box
2-27
2c Check that an image is present, adjust as needed
Installation - Stage Five, cont’d
2a Turn on the MLC 104 IP Plus controller and the PVS 204Sa switcher
2-28 PoleVault Systems Installation Installation - Stage
2-29
3. Final installation
2e Set MLC volume to maximum, and adjust the level on the switcher
PoleVault Systems Installation Installation - Stage
4 Open the sensor and loop a wire around the sensor
Optional Accessory Installation - PPC
Installation Procedure
2-30 PoleVault Systems Installation Optional Accessory Installation
PoleVault Systems Installation Optional Accessory Installation
7. Strip 3/16 of insulation from each conductor on the bare
Optional Accessory Installation - PPC
10 Connect the power supply via the PoleVault switcher
2-32 PoleVault Systems Installation Optional Accessory Installation
5 Priority Page Controller Time DIP switch settings
Testing and Adjustment Procedure
3 / 4 Sensitivity knob adjustment
PoleVault Systems Installation Optional Accessory Installation
2-34 PoleVault Systems Installation Reference Information
Specifications
N Specifications are subject to change without notice
Reference Information
MLC 104 IP Plus
PoleVault Systems Installation Reference Information
Devices PVS 204SA
PVT CV D and PVT RGB D
16-18 lbs 7.3-8.2 kg Projector weight must not exceed 25 lbs 11.3 kg
Installation - Reference Information, cont’d
PoleVault Switcher
2-36 PoleVault Systems Installation Reference Information
Page
Stage Three - Install the PV SI 3C LP Ceiling Speakers
Outline of installation steps
Stage One - Install the Screen and Projector
Stage Four - Install the PMK 450 and the PVS 204SA