CABINET PREPARATION

6. Cut the openings for the following installation: ■ Standard counter top installation, see Fig. 8A ■ Deep counter or island installation, see Fig. 8B

NOTE:

If the deck is used, the sides or bottom of the cutout may be solid combustible or non-combustible material. If the bottom is solid, provide a 6" x 6" cutout in the left rear corner for the gas inlet and power cord clearance. See Fig. 6.

Front Frontprojprojectsoutwaoutward asshownown

from standard depth cabinet.

from standard depth cabinet.

Flush with cabinets

Front flush with cabinets; a minimum of 25-3/4”

Front flush with cabinets; a minimum

cabinet depth required

of 25 3/4" cabinet depth required

Fig. 4

unter-

Co

r-SunkScrews

Fig. 5

Cutout

 

6

6

 

Fig. 6

13

Page 15
Image 15
Fisher & Paykel CP-364GD, CP-486GD, CP-485GD, CP-364GL, CP-484GG, CP-486GL, CP-366 manual From standard depth cabinet