Friedrich SQ06, SQ10, SQ05, SQ08 operation manual Solid Masonry Construction, Figure

Models: SQ08 SQ05 SQ06 SQ10

1 108
Download 108 pages 3.28 Kb
Page 29
Image 29
SOLID MASONRY CONSTRUCTION

Figure 24

 

FRONT EDGE OF LOUVERS

 

 

MUST ALWAYS BE OUTSIDE OF

 

 

EXTERIOR WALL SURFACE.

3/4” MINIMUM FRONT

 

 

 

 

EDGE OF CABINET TO

 

 

INSIDE WALL SURFACE.

3/4” MINIMUM

 

TRIM AROUND THE

 

 

 

 

CABINET WITH A

CABINET FRONT

 

SUITABLE WOOD

 

MOULDING AND

 

 

 

 

FINISH TO SUIT.

1” THICK LUMBER

 

CAULK ALL AROUND

 

CABINET ON OUTSIDE

 

 

 

 

TO INSURE A WEATHER

 

 

TIGHT SEAL.

1” MINIMUM

1/4” SLOPE DOWN.

 

 

 

INSIDE WALL

POSITION AND SECURE

 

 

CABINET DOWNWARD.

 

EXTERIOR WALL

SLOPE OUTSIDE FOR

 

DRAINAGE.

 

 

 

MAX. WALL

7/8” SLOTTED HEAD SCREWS (3 EA. SIDE)

 

THICKNESS

NAILS MAY BE USED IF DESIRED.

 

ALLOWED 8-1/2”

FRR092

 

 

STEP 7. Cut two pieces of standard 1" lumber (supplied by installer) to the length and width required. Place in front and back of bottom sill channel as shown in Figure 24. Secure with nails (supplied by installer).

STEP 8. Seal all holes in the cabinet with caulking compound (supplied by installer).

STEP 9. Complete the installation by following STEPS 6 through 11 of Standard Window Installation (Page 24). Window Seal Gasket mentioned in STEP 9 will not be required.

IMPORTANT: Before operating your unit, read STEP 11 of Standard Window Instructions.

Figure 25

SOLID MASONRY CONSTRUCTION

CAULK ALL SIDES

 

CABINET

MORTAR Manual background

 

 

ELECTRICAL

 

 

RECEPTACLE

NOTE: ELECTRICAL RECEPTACLE LOCATION

 

 

FROM POINT “X” MUST BE WITHIN A MAXIMUM

 

 

RADIUS OF 69” FOR 115V UNITS.

POINT “X”

FRR093

 

 

29

Page 29
Image 29
Friedrich SQ06, SQ10, SQ05, SQ08 operation manual Solid Masonry Construction, Figure