Diagrama 24 | EL BORDE FRONTAL DE |
|
LAS PERSIANAS SIEMPRE |
| |
| DEBE ESTAR AFUERA DE |
|
| LA SUPERFICIE EXTERIOR |
|
| DE LA PARED. | 3/4" MÍNIMO DEL BORDE FRONTAL |
|
| DEL GABINETE HACIA EL INTERIOR |
|
| DE LA SUPERFICIE DE LA PARED. |
3/4” MÍNIMO |
|
|
|
| CORTAR ALREDEDOR DEL |
|
| GABINETE CON UNA |
FRENTE DEL GABINETE |
| MOLDURA DE MADERA |
| ADECUADA Y TERMINAR | |
|
| |
|
| HASTA QUE AJUSTE. |
MADERA DE 1” DE GROSOR |
| RECUBRIR TODO |
| ALREDEDOR DEL GABINETE | |
|
| |
|
| EN EL EXTERIOR PARA |
|
| ASEGURAR UN SELLO |
|
| AJUSTADO PARA EL CLIMA. |
1” MÍNIMO | INCLINACIÓN HACIA ABAJO |
|
|
| |
PARED INTERIOR | DE 1/4". POSICIONAR Y |
|
FIJAR EL GABINETE HACIA |
| |
|
| |
PARED EXTERIOR | ABAJO. INCLINAR HACIA |
|
AFUERA PARA EL DRENAJE. | ||
| MAX . GROSOR DE LA | TORNILLOS CON CABEZA RANURADA DE 7/8" (3 DE |
| PARED PERMITIDO | |
| CADA LADO). SE PUEDEN USAR CLAVOS SI SE DESEA. | |
| DE | |
|
|
FRR092
PASO 7. Cortar dos pedazos de 1" de madera estándar (proporcionada por el instalador) de la longitud y el ancho requerido. Colocar al frente y atrás del canal inferior del alféizar como se muestra en el Diagrama 24. Fijar con clavos (proporcionados por el instalador).
PASO 8. Sellar todos los orificios en el gabinete con un compuesto de recubrimiento (proporcionado por el instalador).
PASO 9. Finalizar la instalación siguiendo los PASOS del 6 al 11 de la Instalación de la Ventana Estándar (Página 24). No será necesario el Empaque de Sellado de la Ventana mencionado en el PASO 9.
IMPORTANTE: Antes de operar su unidad, lea el PASO 11 de las Instrucciones de la Ventana Estándar.
Diagrama 24
CONSTRUCCIÓN DE MAMPOSTERÍA SÓLIDA
GABINETE
MORTERO
NOTA: LA UBICACIÓN DE LA TOMA DE CORRIENTE DESDE EL PUNTO “X” DEBE ESTAR DENTRO DE UN RADIO MÁXIMO DE 69” PARA UNIDADES DE 115 VOLTIOS.
RECUBRIR TODOS LOS LADOS
TOMA DE
CORRIENTE
PUNTO “X” | FRR093 |
29