Furuno SC-60 manual Procedure, Processor unit, cover removed, top view

Models: SC-60

1 106
Download 106 pages 24.46 Kb
Page 37
Image 37

2. INSTALLATION

Procedure

1.Open the top cover of the processor unit.

2.Open the cover of the DGPS receiver assembly.

3.Connect the cable TNCBPJ(140) to J1 on the DGPS receiver assembly.

4.Remove the plug at the rear of the processor unit.

5.Pass the cable TNCBPJ(140) through the hole made at step 4 and fasten it with toothed washer and nut.

6.Fasten the DGPS receiver assembly at the location shown below.

Panhead Screw

 

 

M3X8, 2 pcs.

 

 

DGPS Receiver

 

 

Assembly

J2

Cover

 

 

 

J1

 

Cable Assembly

 

 

TNCBPJ(140)

 

 

Toothed Washer

Nut

Torque

1.37 0.98 Nm

Plug

Processor unit, cover removed, top view

7.Connect the 6P connector of the PH connector 20-061(7-6P) to J2 on the DGPS receiver assy.

8.Connector the 7P connector of the PH connector 20-061(7-6P) to J10 on the circuit board 20P8171.

2-23

Page 37
Image 37
Furuno SC-60 manual Procedure, Processor unit, cover removed, top view