3.0Installation
Before installing the equipment, it is necessary to take the following precautions:
1.) If the equipment is mounted in an enclosed or multiple rack assembly, the environmental temperature around the equipment must be less than or equal to 500C.
2.) If the equipment is mounted in an enclosed or multiple rack assembly, adequate airflow must be maintained for proper and safe operation.
3.) If the equipment is mounted in an enclosed or multiple rack system, placement of the equipment must not overload or load unevenly the rack system.
4.) If the equipment is mounted in an enclosed or multiple rack assembly, verify the equipment’s power requirements to prevent overloading of the building/s electrical circuits.
5.) If the equipment is mounted in an enclosed or multiple rack assembly verify that the equipment has a reliable and uncompromised earthing path.
6.) 24vdc,
7.)
This section describes installation of the Magnum 6K25e Switches, as well as connection of the various Ethernet media types.
3.1Locating Magnum 6K25e Switches
The location of a Magnum 6K25e Switch
is dependent on the physical layout of the network. Typically the Switch is placed in a central wiring
location where groups of network devices need to be connected in order to communicate with each other. These Switches are typically rack mounted in a wiring closet see Section 3.3.2 below), but
because they have rubber feet they can also be installed on a shelf or table top unit. The compact size allows it to be easily placed in an office or lab area, and it can also be either shelf of
www . GarrettCom . com