Magnum 6KQ Managed Field Switch Installation and User Guide

(04/07)

“+ve potential”. The more “+ve” voltage lead from 48V or –48V supply must be connected to the post labeled “+”.

The connection procedure is straightforward. Simply connect the DC leads to the Switch’s power terminals, positive (+) and negative (-) screws. The use of Ground (GND) is optional; it connects to the Switch chassis. Ensure that each lead is securely tightened.

C5.1 UL Requirements

The following must be adhered to in order to conform to UL requirements:

1.Minimum 18 AWG cable for connection to a Centralized DC power source.

2.Minimum 14 AWG cable for connection to earthing wiring.

3.Use only with Listed 10 A circuit breaker provided in building installation.

4.“Complies with FDA radiation performance standards, 21 CFR subchapter J.” or equivalent.

5.Fastening torque of the lugs on the terminal block: 9 inch pound max.

6.Centralized DC Power Source cable securement, use at least four cable ties to secure the cable to the rack at least 4 inches apart with the first one located within 6 inches of the terminal block.

C6.0 ORDERING INFORMATION

To order the optional Dual-Source -48VDC power supply factory installed, order “Dual-Src48V” as a separate line item following the product model.

Example: Magnum 6KQR-48VDC Dual-Src-48V for the regular DS model

Similarly, order the “Dual –source 24VDC” or “Dual-source 125VDC” as a separate line item following the product model.

Example: Magnum 6KQ-24VDC or Magnum P6KQ-125VDC

Dual-Src24Vfor regular models

Or Dual-Src125V-Switch

See the Configuration Guide on the GCI web site at http://www.garrettcom.com/techsupport/insertion_guides/6kqcg.pdf for additional information.

C7.0 OPERATION

Operation of the Dual-Source Magnum 6Ks-48VDC, 24VDC and 125VDC Switch models are identical to that of the standard models.

www . GarrettCom . com

50

Page 56
Image 56
GarrettCom manual C5.1 UL Requirements, C6.0 Ordering Information, Example Magnum 6KQ-24VDC or Magnum P6KQ-125VDC