Installation | |
|
|
☞NOTE
A word about international shipments: As these are heavy pieces of equipment, GBC
Before machines leave our loading dock, they are pre- treated with a VCI protective film to provide total corrosion protection. This protective film is wrapped around the machine and completely sealed. In addition, moisture absorbing silicone desiccant packs are packed inside the crate and machine cabinets.
Prior to start up of the machine, you must remove the desiccant packs from each cabinet and discard. DO NOT operate the machine with the desiccant packs inside the cabinets.
6HWXS
Once the
Tools required:
•1/8" hex wrench
•Adjustable wrench
Setup Procedure
1.Inspect the machine for any obvious shipping dam- age.
2.Remove the drive and control side cabinet covers with the 1/8" hex wrench by removing the screws securing the covers to the machine. Lift the covers off.
3.Inspect all the bolts and tighten any that were loos- ened during shipping.
4.Have a certified electrician wire the machine directly to a power source.
5.Connect the machine to the air supply.
6.Replace all cabinet covers.
/HYHOLQJ
Tools required:
•Adjustable wrench
•Carpenter's level (or equivalent)
To level the laminator:
1.Install the four level pads (included in the acces- sory pack) on the ends of the foot bolts.
2.Remove the rear idler so that you can place a car- petner’s level across the pull roll to the bottom main roll.
Figure
3.Level this side of the machine front to rear, raising or lowering the leveling pads by adjusting the nuts on the foot bolts.
4.Move the level to the other side of the machine and level front to rear.
5.Place the level directly on the chrome tie bar below the pull rolls and level the back of the machine side to side.