GE 8500 Series Before You Begin, Installation, Instructions, Zoneline Air, Conditioners

Models: 8500 Series

1 28
Download 28 pages 10.39 Kb
Page 10
Image 10
Installation

Installation

Zoneline Air

Instructions

Conditioners

Questions? Visit our Website at: GEAppliances.com or call 800.GE.CARES (800.432.2737).

BEFORE YOU BEGIN

Read these instructions completely and carefully.

IMPORTANT Save these instructions for local inspector’s use.

IMPORTANT Observe all governing codes and ordinances.

Note to Installer Be sure to leave these instructions with the owner.

Note to Owner Keep these instructions for future reference.

• Proper installation is the responsibility of the installer.

• Product failure due to improper installation is not covered under the Warranty.

• You MUST use all supplied parts and use proper installation procedures as described in these instructions when installing this air conditioner.

TOOLS YOU WILL NEED

Phillips screwdriver

Adjustable wrench

Saw

Hammer

IMPORTANT ELECTRICAL SAFETY–READ CAREFULLY

Zoneline AirWARNING: RISK OF ELECTRIC SHOCK.

All electrical connections and wiring MUST be installed by a qualified electrician.

Follow the National Electrical Code (NEC) and/or local codes and ordinances.

For personal safety, this Zoneline unit and case must be properly grounded.

Protective devices (fuses or circuit breakers) acceptable for Zoneline installations are specified on the nameplate of each unit.

Do not use an extension cord with this unit.

Aluminum building wiring may present special problems—consult a qualified electrician.

When the unit is not running there is still voltage to the electrical controls.

Disconnect the power to the unit before servicing by:

1.Removing the power cord (if it has one) from the wall receptacle.

OR

2.Removing the branch circuit fuses or turning the circuit breakers off at the panel.

Tape measure

InstructionsWARNING: RISK OF ELECTRIC SHOCK. Can cause injury or death. This appliance must be properly grounded. Where a 2-prong wall outlet is encountered, it is your responsibility and obligation to have it replaced with a properly grounded 3-prong outlet.

10

Page 10
Image 10
GE 8500 Series Before You Begin, Installation, Instructions, Zoneline Air, Conditioners, Tools You Will Need