The case may be installed
Read completely, then follow
NOTE: Obtain all materials locally for mounting the air conditioner through-
1
D
IMPORTANT (cont.)
Secure with 14 wood screws anchored at least an inch into the wall support structure.
NOTE: Drill pilot holes, if necessary, for proper installation. If the frame is oversized, use shims to prevent case distortion.
1IMPORTANT
All side and top louvers in the case must project on the outdoor side of the wall.
The room side of the case must project into the room far enough to maximize the balance of the unit.
2FINISH THE WALL OPENING
ACaulk all four sides on the outdoor side of the case to prevent moisture from getting through to the interior wall. Use of flashing (drip rail) will further prevent water from dripping inside the wall and down the outside of the building.
The case must be installed level from side-
Lintel angle is required to support bricks or blocks above opening.
Flashing is required and should extend the length of the opening to ensure no inside cavity leakage occurs.
| Remove the air conditioner from the case. |
A | |
| For specific instruction, refer to the Window |
| Installation Instructions. |
Lintel angle
Caulking
OUTSIDE
Air louvers (top and sides must project on the outdoor side of the wall)
Plaster line
Trim molding (if desired)
INSIDE
Bottom rail
B Make certain that a wall receptacle is |
available close to the hole location or make |
arrangements to install a receptacle. |
Wood filler and caulking (above and below the flashing)
Flashing (Drip rail)
Case Bottom
bottom rail
CPlace the case in the wall opening and place wood support strips between the case bottom and the flashing on both sides of the bottom rail. They should be the same height as the bottom rail and the same length as the wall opening.
Flashing |
|
(Drip rail) | Wood support strips |
|
BPlace the air conditioner into the case.
For specific instruction, refer to the Window Installation Instructions.