GE AZ75H18EAC, 49-7419-2 Before You Begin, Tools You Will Need, Installation Instructions

Models: 49-7419-2 AZ75H18EAC

1 28
Download 28 pages 41.01 Kb
Page 10
Image 10
Installation Instructions

Installation Instructions

Zoneline Air Conditioners

Questions? Visit our Website at: GEAppliances.com or call 800.GE.CARES (800.432.2737).

BEFORE YOU BEGIN

Read these instructions completely and carefully.

IMPORTANT – Save these

instructions for local inspector’s use.

IMPORTANT – Observe all

governing codes and ordinances.

Note to Installer – Be sure to leave these instructions with the owner.

Note to Owner – Keep these instructions for future reference.

Proper installation is the responsibility of the installer.

Product failure due to improper installation is not covered under the Warranty.

TOOLS YOU WILL NEED

Phillips screwdriver

Adjustable wrench

Saw

Hammer

IMPORTANT ELECTRICAL SAFETY–READ CAREFULLY

Zoneline Air ConditionersCAUTION:

All electrical connections and wiring MUST be installed by a qualified electrician.

Follow the National Electrical Code (NEC) and/or local codes and ordinances.

For personal safety, this Zoneline unit and case must be properly grounded.

Protective devices (fuses or circuit breakers) acceptable for Zoneline installations are specified on the nameplate of each unit.

Do not use an extension cord with this unit.

Aluminum building wiring may present special problems—consult a qualified electrician.

When the unit is not running there is still voltage to the electrical controls.

Disconnect the power to the unit before servicing by:

1.Removing the power cord (if it has one) from the wall receptacle.

OR

2.Removing the branch circuit fuses or turning the circuit breakers off at the panel.

Tape measure

BEFORE YOU BEGINWARNING: Before beginning the installation, switch power off at the service panel and lock the area to prevent power from being switched on accidentally. When the area cannot be locked, securely fasten a prominent warning device, such as a tag, to the service panel.

10

Page 10
Image 10
GE AZ75H18EAC, 49-7419-2 Before You Begin, Tools You Will Need, Installation Instructions, Zoneline Air Conditioners