GE JGBS19GEP, JGSS05GES, JGSS05GER, JGBS15GER Leveling The Range, When All Hookups Are Completed

Models: JGBS02EM JGBS02PN JGBS16GEP JGBS04GPR JGBS04PR JGBS04GER JGBS04ER JGBS14GES JGBS17GER JGBS18GES JGBS06ER JGBS19GEP JGBS06ES JGBS12GER JGBS15GER JGSS05GER JGSS05GES

1 48
Download 48 pages 61.19 Kb
Page 39
Image 39
❑LEVELING THE RANGE

LEVELING THE RANGE

1.Remove the storage drawer, broiler drawer or kick panel.

2.Use a 3/16” open-end or socket wrench to back out both rear leveling legs approximately two turns.

3.Use a 1’%” open-end or adjustable wrench to back out the front leveling legs two turns.

4.Install the oven shelves in

the oven and position the range where it will be installed.

5.Check for levelness by placing a spirit level or a cup, partially filled with water, on one of the oven racks. If using a spirit level, take two readings—with the level placed diagonally first in one direction and then the other.

6.Adjust the leveling legs until the range is level.

7.After the range is level, slide the range away from the wall so that the Anti-Tip device can be installed.

11 INSTALLING IHEAHII.IIP DEVICE

WARNING:

Range must be secured with an approved Anti-Tip device.

s Unless properly installed, the range could be tipped by you or a child standing, sitting or leaning on an open door.

. After installing the Anti-Tip device, verify that it is in place by carefully attempting to tilt the range forward.

This range has been designed to meet all recognized industry tip standards for all normal conditions.

. The use of this device does not preclude tipping of the range when not properly installed.

. If the Anti-Tip device supplied with the range does not fit this application, use the universal Anti-Tip device WB02X7909.

1.Mark the wall where the NGHT EDGE of the range is to be located. Be sure to allow for the countertop overhang if you intend to install the range next to cabinets.

toward the center of the range from the marked edge of the range.

3.Using the device as a template, mark the position of the hole for the screw.

4.For wood construction, drill a pilot hole at an angle of 20 degrees from the horizontal. A nail or awl maybe used if a drill is not available.

Mount the Anti-Tip device with the screw provided.

For cement or concrete construction, you will need a 1/4” x 1%” lag bolt and a 1/2” O.D. sleeve anchor, which are not provided. Drill the recommended size hole for the hardware.

Install the sleeve anchor into the drilled hole and then install the lag bolt through the device. The bolts must be properly tightened as recommended for the hardware.

5.Slide the range against the wall, and check for proper instillation by grasping the front edges of the rear surface unit openings and carefully attempting to tilt the range forward.

WHEN ALL HOOKUPS ARE COMPLETED:

~KE SURE ALL CONTROLS ARE LEFT IN THE OFF POSITION.

~KE SURE THE FLOW OF COMBUSTION AND VENTILATION AIR TO THE MNGE IS UNOBSTRUCTED.

39

Page 39
Image 39
GE JGBS19GEP manual Leveling The Range, When All Hookups Are Completed, ~Ke Sure All Controls Are Left In The Off Position