Installation Instructions

IMPORTANT SAFETY INSTRUCTIONS

FOR YOUR SAFETY

For Personal Safety, remove house fuse or open circuit breaker before beginning installation. Failure to do so could result in serious injury or death.

Be sure your cooktop is installed properly by a qualified installer or service technician.

To eliminate the risk of burns or fire due to reaching over heated surface elements, cabinet storage located above the surface units should be avoided. If cabinet storage space is to be provided, the risk can be reduced by installing a

range hood that projects horizontally a minimum of 5beyond the bottom of the cabinets. Cabinet

installation above the cooktop may be no deeper than 13.

Make sure the cabinets and wall coverings around the cooktop can withstand the temperatures (up to 200°F) generated by the cooktop.

The cooktop should be easy to reach and lighted with natural light during the day.

Always disconnect the electrical service to the cooktop before repairing or servicing the cooktop. This can be done by disconnecting the fuse or circuit breaker. Failure to do this could result in a dangerous or fatal shock. Know where your main disconnect switch is located. If you do not know, have your electrician show you.

ELECTRICAL REQUIREMENTS

This appliance must be supplied with the proper voltage and frequency, and connected to an individual, properly grounded branch circuit, protected by a circuit breaker or a time delay fuse as noted on name plate.

We recommend you have the electrical wiring and hookup of your cooktop connected by a qualified electrician. After installation, have the electrician show you where your main cooktop disconnect is located.

Wiring must conform to National Electrical Code. You can get a copy of the National Electrical Code, ANSI/NFPA No. 70-Latest Edition, by writing:

National Fire Protection Association

Batterymarch Park

Quincy, MA 02269

In Canada, wiring must conform to the Canadian Electrical Code (CEC).

The cooktop conduit wiring is approved for copper wire connection only, and if you have aluminum house wiring, you must use special UL approved connectors for joining copper to aluminum. In Canada, you must use special CSA approved connectors for joining copper to aluminum.

You must use a two-wire, three conductor 208/240 VAC, 60 Hertz electrical system. A white (neutral) wire is not needed for this unit. The cooktop must be installed in a circuit that does not exceed 125 VAC nominal to ground.

Refer to the name plate on your cooktop for the KW rating for your cooktop.

Name plate location

13

Page 13
Image 13
GE JP256 installation instructions Important Safety Instructions, For Your Safety, Electrical Requirements

JP256 specifications

The GE JP256 is an advanced gas turbine designed for high-efficiency power generation, catering to the growing energy demands of both industrial and municipal applications. As part of General Electric's renowned fleet of gas turbines, the JP256 boasts impressive performance metrics that set it apart in the competitive energy landscape.

One of the standout features of the GE JP256 is its combined cycle capability. This technology allows the turbine to work alongside steam turbines, enabling a more efficient use of fuel and improving overall thermal efficiency. This combined cycle setup can achieve efficiencies exceeding 60%, which helps operators reduce fuel costs and minimize greenhouse gas emissions. This is particularly crucial in today's energy market, where there is a strong push toward sustainable practices.

The JP256 is designed with a simple cycle rating, delivering up to 256 MW of power at ISO conditions. This makes it suitable for both peaking and base-load generation, providing flexibility in meeting fluctuating energy demands. Additionally, its low operational and maintenance costs make it an attractive option for utility companies looking to optimize their energy generation portfolio.

In terms of technology, the GE JP256 employs advanced materials and manufacturing techniques, enhancing its durability and performance. The turbine features a high-efficiency airfoil design, which improves aerodynamics and contributes to overall efficiency gains. Its advanced control systems utilize real-time data analytics to optimize performance, ensuring that the turbine operates at maximum efficiency under varying load conditions.

The characteristics of the JP256 also include a modular design that simplifies maintenance and reduces downtime. This design not only eases the replacement of components but also shortens the time required for routine maintenance activities. Moreover, GE’s commitment to innovation is reflected in the turbine's compatibility with various fuels, including natural gas and biogas, allowing for greater operational flexibility.

Noise reduction technologies are also integral to the JP256, making it an optimal choice for installations in urban areas where emissions and noise control are critical. Its compact footprint allows for easier integration into existing plants without requiring significant alterations to infrastructure.

In summary, the GE JP256 gas turbine stands out for its combined cycle capabilities, high efficiency, low operational costs, and advanced technologies. Designed for versatility and sustainability, it is a comprehensive solution for meeting the modern demands of power generation.