GE JP256 Installation Instructions CHECKLISTS, Pre-Test Checklist, Operation Checklist

Models: JP256

1 80
Download 80 pages 55.55 Kb
Page 20
Image 20
Installation Instructions

Installation Instructions

CHECKLISTS

1 PRE-TEST CHECKLIST

ARemove all protective film, if present, and any stickers.

BCheck to be sure that all wiring is secure and not pinched or in contact with moving parts.

CCheck level of appliance.

DCheck that the cooktop is properly grounded.

2 OPERATION CHECKLIST

ARemove all items from the top of the cooktop surface.

BTurn on the power to the cooktop. Verify that all surface burners operate properly.

CCheck that the circuit breaker is not tripped nor the house fuse blown.

DCheck that conduit is securely connected to the junction box.

ESee troubleshooting list.

NOTE TO ELECTRICIAN:

The power leads supplied with this appliance are UL recognized for connections to larger gauge household wiring. The insulation of these leads is rated at temperatures much higher than the temperature rating of household wiring. The current carrying capacity of a conductor is governed by the wire gauge and also the temperature rating of the insulation around the wire.

NOTE: ALUMINUM WIRING

WARNING:

IMPROPER CONNECTION OF ALUMINUM HOUSE WIRING TO THE COPPER LEADS CAN RESULT IN A SERIOUS PROBLEM.

Splice copper wires to aluminum wiring using special connectors designed and UL approved for joining copper to aluminum and follow the manufacturer’s recommended connector procedure closely.

NOTE: Wire used, location and enclosure of splices, etc., must conform to good wiring practice and local codes.

20

Page 20
Image 20
GE JP256 Installation Instructions CHECKLISTS, Pre-Test Checklist, Operation Checklist, Note To Electrician