Manitowoc Ice 11M Installation Checklist, 2-20, Section, Observe the pump operations for leaks

Models: 11M

1 42
Download 42 pages 63.4 Kb
Page 30
Image 30
Installation Checklist

Installation

Section 2

 

 

Installation Checklist

Check all fittings and conduit attachments for leaks. Check all insulated connections to make sure that they are sealed.

Observe the pump operations for leaks.

Check the water bath for full ice bank.

The stabilized water bath operating temperature must be maintained at 33°F (.6°C) to 35°F (1.7°C).

Close water bath feeder valve completely.

2-20

Part Number 020001552 5/11

Page 30
Image 30
Manitowoc Ice 11M manual Installation Checklist, 2-20, Section, Observe the pump operations for leaks