Plumbing/Water Supply

Installation

Section 2

 

 

Plumbing/Water Supply

PLUMBING POTABLE WATER

 

Required

Drain

Water

Model

Water

Connections

Supply

 

Pressure

 

 

 

 

 

 

 

11M

40 – 70 psig

3/4" ID

3/8" ID

 

(2.8 – 4.9 bar)

within 6 ft (2 m)

EVA Line

 

 

 

 

A 1" (2.54 cm) ID copper inlet water line equipped with a 3/4" (1.905 cm) FPT sweat adapter with shut-off must be supplied by plumber at rear of equipment. Appropriate floor drains must be provided within 6 ft (183 cm) of each unit installed.

NOTE: The carbonator in this unit is provided with a dual check valve type back-flow preventer, which conforms to ASSE 1032.

Potable water connections to the equipment must comply with the basic plumbing code of the Building Officials and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the Food and Drug Administration. Verify local plumbing code requirements.

PLUMBING REQUIREMENTS – GENERAL

Incoming water supply must be provided before installation of the refrigeration unit and must comply with local plumbing requirements.

1.A minimum 1" (2.54 cm) water supply line with a manual shut-off valve must be plumbed at least 6 ft (183 cm) from the unit. The incoming water supply pressure must not exceed 70 psi static (4.8 bar) and be no less than 40 psi (2.8 bar) dynamic. If supply water pressure is greater than 70 psi (5 bar), a water regulator will be required.

2.Locate the drain hose, bracket, and two screws provided in the installation kit. Attach the drain hose to the water bath overflow tube located on the bottom of the refrigeration unit.

3.Connect the water manifold supply line, located on the bulkhead panel in the motor compartment to the main water supply. The main water supply shut-off valve must remain in the OFF position. If a water filter is to be installed, connect the line to the outlet fitting of the filter. Plumb according to applicable plumbing codes.

Bracket

PLUMBING POTABLE WATER Bottom

of Unit

Screw

PLUMBING REQUIREMENTS – GENERAL Drain Hose

Drain Hose Connection

4.When a water cooled condenser is installed, a copper supply line (not supplied with unit) must be plumbed to the 3/8" (.965 cm) male flare fitting installed in the water shut-off assembly. The shut-off must be placed in the OFF position. A copper drain line (not supplied) is to be connected to the outlet fitting of the water cooled condenser and routed to the floor drain.

WATER SUPPLY

1.Use the built in fill valve that is already plumbed into the unit.

2.An appropriate floor drain is required within 6 ft (2 m) of the unit.

3.Potable water connections to the equipment must comply with the basic plumbing code of the Building Officials and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the Food and Drug Administration. Verify local plumbing code requirements.

2-8

Part Number 020001552 5/11

Page 18
Image 18
Manitowoc Ice 11M Plumbing/Water Supply, Plumbing Potable Water, Plumbing Requirements - General, Drain Hose Connection