Manitowoc Ice 11M Table of Contents continued, Section Operation, 2-12, Equipment Placement, 2-13

Models: 11M

1 42
Download 42 pages 63.4 Kb
Page 4
Image 4
Table of Contents (continued)

Table of Contents (continued)

Refrigeration Unit Installation

2-12

Positioning of Refrigeration Unit

2-12

Equipment Placement

2-12

Electrical Connections

2-12

Tower Installation

2-12

Routing Insulated Conduit

2-12

Connecting Insulated Conduit

2-12

Connecting Supply Lines

2-13

Connect the drain

2-14

Proper Use of John Guest Fittings

2-14

Insulating Connections

2-16

Aeroquip Connection

2-16

Condenser and Pre-charged Lines Installation

2-16

Remote Condenser Requirements

2-16

Pre-charged Refrigeration Line Requirements

2-17

Installing the Multiplex Remote Condenser

2-17

Connecting the Pre-charged Refrigeration Lines

2-18

Testing CO2 Circuit for Leaks

2-18

Testing Syrup Circuit (5 gallon tanks only)

2-18

Start-Up

2-19

Preparing Ice Bank

2-19

Building an Ice Bank

2-19

Installation Checklist

2-20

Section 3

Operation

Typical System

3-1

How the Multiplex Works

3-2

Water Bath Access

3-2

Service Access

3-2

Sequence of Operation

3-2

Pre-mix Refrigeration Unit

3-2

Start-up

3-3

Placing Equipment in Operation

3-3

Placing the Carbonation System in Operation

3-3

Equipment Setup and Close Procedure

3-3

Equipment Setup Procedure

3-3

Equipment Close Procedure

3-3

ii

Part Number 020001552 5/11

Page 4
Image 4
Manitowoc Ice 11M Table of Contents continued, Section Operation, 2-12, Positioning of Refrigeration Unit, 2-13, 2-14