Manuals
/
Manitowoc Ice
/
Kitchen Appliance
/
Refrigerator
Manitowoc Ice
11M
manual
Operation, Section, This Page Intentionally Left Blank
Models:
11M
1
34
42
42
Download
42 pages
63.4 Kb
31
32
33
34
35
36
37
38
<
>
Specs
Install
Connecting Insulated Conduit
Warranty
Dimension
Maintenance
Water Bath Access
Equipment Setup Procedure
Checklist
How to
Page 34
Image 34
Operation
Section 3
THIS PAGE INTENTIONALLY LEFT BLANK
3-4
Part Number 020001552 5/11
Page 33
Page 35
Page 34
Image 34
Page 33
Page 35
Contents
Model 11M Root Beer System Refrigeration Unit
Installation, Use & Care Manual
America’s Quality Choice in Refrigeration
Read These Before Proceeding
Safety Notices
Procedural Notices
PERSONAL INJURY POTENTIAL
Attention Marine Installations
Table of Contents continued Section
Section Installation
Specifications
Tower Installation
Table of Contents continued
Equipment Placement
Connecting Insulated Conduit
Beverage System Cleaning
Table of Contents continued Section Maintenance
Section Before Calling for Service
Bag-In-BoxSystem Sanitation
THIS PAGE INTENTIONALLY LEFT BLANK
Section
How to Read a Model Number
Section General Information
Read This Manual
ATTENTION MARINE INSTALLATIONS
Accessories
Specifications
Special Applications
Warranty Information
Serial Plate Location
Section
General
Section Installation
Kit assembly includes
UNPACKING AND INSPECTING
Top View
Installation
Dimensions and Clearances
Side View
REMOTE CONDENSER
BLADE TOWER
Safe Installation Dos and Don’ts
RATINGS
Location Requirements
CLEARANCES
REQUIREMENTS FOR POST MIX UNITS
Electrical
Installer Instructions
SPECIFICATIONS
Ambient Location Requirement
GROUNDING INSTRUCTIONS
PLUMBING REQUIREMENTS - GENERAL
Plumbing/Water Supply
PLUMBING POTABLE WATER
Drain Hose Connection
PLUMBING CIRCUIT DIAGRAMS - MODEL 11M ROOT BEER
Single Tower Plumbing
2-10
Model 11M Root Beer Dual Tower Plumbing
2-11
Model 11M Root Beer Three Tower Plumbing
TOWER INSTALLATION
Refrigeration Unit Installation
EQUIPMENT PLACEMENT
CONNECTING INSULATED CONDUIT
2-13
CONNECTING SUPPLY LINES
Connecting conduit at the refrigeration unit
Proceed with the Following Tests
2-14
Proper John Guest Fitting Installation
Connect the drain
PROPER USE OF JOHN GUEST FITTINGS
Model 11M Connections
2-15
Control Switches
2-16
Condenser and Pre-chargedLines Installation
Aeroquip Connection
INSULATING CONNECTIONS
2-17
INSTALLING THE MULTIPLEX REMOTE CONDENSER
PRE-CHARGEDREFRIGERATION LINE REQUIREMENTS
TESTING SYRUP CIRCUIT 5 GALLON TANKS ONLY
CONNECTING THE PRE-CHARGED REFRIGERATION LINES
TESTING CO2 CIRCUIT FOR LEAKS
2-18
2-19
Start-Up
Preparing Ice Bank
BUILDING AN ICE BANK
Observe the pump operations for leaks
Installation Checklist
2-20
Check the water bath for full ice bank
Typical System
Section Operation
Operation
Water Filters
How the Multiplex Works
WATER BATH ACCESS
SERVICE ACCESS
Sequence of Operation
EQUIPMENT CLOSE PROCEDURE
Equipment Setup and Close Procedure
EQUIPMENT SETUP PROCEDURE
Start-up
Section
BEVERAGE SYSTEM CLEANING
Section Maintenance
Maintenance
Sanitizing
FIGAL BEVERAGE SYSTEM
Back-flowPreventer Maintenance
Shipping, Storage and Relocation
Section
Before Calling for Service
Section Before Calling for Service
Checklist
Section
Before Calling for Service
THIS PAGE INTENTIONALLY LEFT BLANK
Page
Part Number 020001552 5/11
Top
Page
Image
Contents