Installation Instructions

PREPARATION

TOOLS AND MATERIALS

YOU WILL NEED

•Saw

•Duct tape

•Measuring tape or scale

•Carpenter’s square

•Adjustable wrench or socket set (7/16″ socket and ratchet)

•Drill and drill bit

•1/4″ nut driver

•Sheet metal screws

•Pipe wrench

•Manual gas line shut-off valve

•Pipe joint sealant that resists action of LP gas

•Ductwork to suit the installation

For rigid connection:

•Shut-off valve

•Union

•Pipe fittings as required

For flexible connection where local codes permit:

•Flexible metal tubing (same 3/4″ or 1/2″ I.D. as gas supply line)

HIGH ALTITUDE ORIFICE CONVERSION KIT

Use for cooktop operation at elevations above 5000 ft. (1500m).

Specify kit for Natural Gas or LP Gas when ordering:

Natural Gas High Altitude

Orifice Conversion Kit . . . . . . . . . . . . . . . . . . . . . . . . .WB28X10114 LP High Altitude Orifice Conversion Kit . . . . . . . .WB28X10115 To order, please call our toll-free number:

National Parts Center . . . . . . . . . . . . . 800.626.2002

30″ COOKTOP (DIMENSIONS FOR REFERENCE ONLY)

Unit shown fully assembled.

227⁄16″

297⁄8″

(229⁄16″ SS)

(30″ SS)

 

22″

23⁄16″

(21⁄4″ SS)

201⁄2″

283⁄4″

Unit must be vented to the outside!

17

Page 17
Image 17
GE PGP989 manual Preparation, Tools and Materials YOU will Need, 30″ Cooktop Dimensions for Reference only