GE PGP989 manual Preparation, Installation Instructions, Tools And Materials You Will Need

Models: PGP989

1 72
Download 72 pages 29.09 Kb
Page 17
Image 17
PREPARATION

Installation Instructions

PREPARATION

TOOLS AND MATERIALS

YOU WILL NEED

Saw

Duct tape

Measuring tape or scale

Carpenter’s square

Adjustable wrench or socket set (7/16socket and ratchet)

Drill and drill bit

1/4nut driver

Sheet metal screws

Pipe wrench

Manual gas line shut-off valve

Pipe joint sealant that resists action of LP gas

Ductwork to suit the installation

For rigid connection:

Shut-off valve

Union

Pipe fittings as required

For flexible connection where local codes permit:

Flexible metal tubing (same 3/4or 1/2I.D. as gas supply line)

HIGH ALTITUDE ORIFICE CONVERSION KIT

Use for cooktop operation at elevations above 5000 ft. (1500m).

Specify kit for Natural Gas or LP Gas when ordering:

Natural Gas High Altitude

Orifice Conversion Kit . . . . . . . . . . . . . . . . . . . . . . . . .WB28X10114 LP High Altitude Orifice Conversion Kit . . . . . . . .WB28X10115 To order, please call our toll-free number:

National Parts Center . . . . . . . . . . . . . 800.626.2002

30COOKTOP (DIMENSIONS FOR REFERENCE ONLY)

Unit shown fully assembled.

22716

2978

(22916SS)

(30SS)

 

22

2316

(214SS)

TOOLS AND MATERIALS 2012For rigid connection:

2834

Unit must be vented to the outside!

17

Page 17
Image 17
GE PGP989 Preparation, Installation Instructions, Tools And Materials You Will Need, High Altitude Orifice Conversion Kit