GE ZBD6700, ZBD6400 Installation Preparation, Materials You Will Need, Tools You Will Need

Models: ZBD7000 ZBD7100 ZBD6700 ZBD6500 ZBD6600 ZBD6900 ZBD6400

1 16
Download 16 pages 7.37 Kb
Page 4
Image 4
Installation Preparation

Installation Preparation

MATERIALS YOU WILL NEED:

Materials Required for All Installations

90° Elbow (3/8”NPT external thread on one end, opposite

end sized to fit water supply)

Note: Use new ferrule. Do not use old parts.

Strain relief for electrical connection

Thread seal tape

UL Listed wire connectors (3)

Screw type hose clamps

Screw Type Clamps

90° Elbow

Wire Nuts

Strain Relief

Thread Seal

Tape

Materials For New Installations Only:

♦ Air gap for drain hose, if required

Waste tee for house plumbing, if applicable

♦ Electrical cable or power cord, if applicable

Shut-Off

Electrical Cable

Waste Tee

Valve

or Power Cord

♦ Hand shut-off valve (recommended)

 

Water line 3/8” min. copper or 1/2” min. plastic (plastic

must be tested for temperature and pressure) ♦ Coupler for extending drain line, if applicable

Air

Coupler

 

Gap

Hot Water Line

TOOLS YOU WILL NEED:

Flat Blade Screwdriver

Tools Required for All Installations

Phillips head and flat blade screwdrivers

3/8”, 5/16” and 1/4” nutdrivers

♦ Level

 

Safety Glasses

 

 

♦ Carpenters square

 

 

♦ Measuring tape

 

 

♦ Safety glasses

Wire Strippers

 

♦ Flashlight

Adjustable

 

♦ Bucket to catch water when flushing the line

Wrench

Bucket

Tubing cutter

Gloves to protect against sharp edges

Wire strippers

For New Installations Only:

 

Nut Driver

Phillips

Head

Screwdriver

 

Tubing

 

Cutter

Flashlight

 

Drill

 

and Bits

♦ Drill and appropriate bits ♦ Hole saw set

Measuring Tape

Level

Square

Hole

Saw Set

Gloves

4

Page 4
Image 4
GE ZBD6700 Installation Preparation, Materials You Will Need, Tools You Will Need, Materials For New Installations Only