GE ZV900 DUCTWORK, Wiring Locations, Install Framing for Hood Support, Ceiling ducting

Models: ZV900

1 21
Download 21 pages 17.52 Kb
Page 10
Image 10

Installation Instructions

INSTALLATION—VENTED TO THE OUTSIDE

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.

Locate the template packed with the literature.

Measure 36from the floor to the top of the cooking surface. Add hood installation height determined on page 7. Mark that location.

Use a level to draw a straight pencil line on the wall.

5-1/2” centerline to wall

 

 

FOR CEILING VENT DUCTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8-1/2” dia. hole

 

 

 

 

Ceiling

 

 

 

 

 

Centerline

26” above

 

 

 

 

 

 

 

 

the marked bottom

 

FOR WALL VENT DUCT

 

 

 

 

pencil line for

 

 

 

 

installation height.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tape the template in position along the penciled line. CHECK TO BE SURE THE TEMPLATE IS LEVEL.

Ceiling ducting:

If ductwork will vent straight up to the ceiling:

Use a level to draw a line straight up, from the centerline on the template to the ceiling.

Measure 5-1/2from the back wall to the centerline of an 8-1/2hole on the ceiling.

NOTE: If drywall is not present, add drywall thickness to the 5-1/2dimension.

Wall Ducting:

If ductwork will vent to the rear:

Use a level to draw a line straight up from the centerline on the template.

Measure at least 26above the pencil line that

indicates the bottom installation height, to the centerline of an 8-1/2dia. duct hole. (Hole may be elongated for duct elbow.)

HOUSE WIRING LOCATION:

The junction box is located on the top left side of the hood.

Wiring should enter the back wall at least 22above the bottom of the hood, and within 6of the left side of the centerline.

1INSTALL FRAMING FOR HOOD SUPPORT

IMPORTANTFraming must be capable of supporting 100 lbs.

8-1/2” min. opening for ductwork

View from rear

cleats

1” x 6” min.

mounting

support

Centerline of

installation

space

If drywall is present, mark the screw hole locations for the top mounting brackets. Remove the template.

Cut away enough drywall to expose 2 vertical studs at the bracket location indicated on the template.

Install a horizontal support at least 1x 6between two wall studs at the bottom mounting bracket installation location. The horizontal support must be flush with the room side of the studs. Use cleats behind both sides of the support to secure to wall studs.

Reinstall drywall.

9

Page 10
Image 10
GE ZV900 DUCTWORK, Wiring Locations, Install Framing for Hood Support, Ceiling ducting, Wall Ducting

ZV900 specifications

The GE ZV900 is a state-of-the-art multi-gas monitoring solution designed for both industrial and environmental applications. Known for its accuracy, reliability, and advanced features, the ZV900 plays a crucial role in ensuring compliance with safety regulations and environmental standards.

One of the standout features of the GE ZV900 is its ability to measure a wide range of gases, including but not limited to carbon dioxide (CO2), oxygen (O2), nitrogen oxides (NOx), and particulates. This versatility makes it an ideal choice for facilities that require comprehensive air quality monitoring.

The ZV900 utilizes cutting-edge technology that incorporates advanced sensors and data analysis algorithms, allowing for real-time monitoring and reporting of gas concentrations. The high precision of these sensors ensures that users receive accurate and reliable data, which is critical when making operational decisions or responding to potential hazards.

In terms of connectivity, the GE ZV900 is equipped with options that support various communication protocols, such as MODBUS, BACnet, and Ethernet. This connectivity enables seamless integration into existing automation and monitoring systems, enhancing the overall functionality of the monitoring setup. Users can also access data remotely through cloud-based platforms, facilitating easier management and analysis of air quality metrics.

Another significant characteristic of the ZV900 is its user-friendly interface. The device features an intuitive touchscreen display that allows operators to easily navigate through different settings and view real-time data. This design ensures that even personnel with minimal training can effectively use the system to monitor gas concentrations and react to alerts.

Moreover, the GE ZV900 is built with durability in mind. It is designed to withstand harsh environmental conditions, making it suitable for various applications, including power generation, manufacturing, and environmental monitoring. The robust construction ensures longevity and reduces the need for frequent maintenance.

In conclusion, the GE ZV900 is a powerful, versatile, and reliable solution for multi-gas monitoring. Its advanced technologies, user-friendly design, and wide range of applications make it an essential tool for industries focused on safety and environmental stewardship. With the capability to provide real-time data and integrate seamlessly into existing systems, the ZV900 stands out as an essential asset in the quest for cleaner, safer air.