GE ZV900 installation instructions Remove The Packaging, Tools And Materials Required Not Supplied

Models: ZV900

1 21
Download 21 pages 17.52 Kb
Page 7
Image 7
TOOLS AND MATERIALS REQUIRED (NOT SUPPLIED)
Pliers
Duct tape
Measuring tape

Installation Preparation

TOOLS AND MATERIALS REQUIRED (NOT SUPPLIED)

…Tape measure

…Knife

…Spirit level

…Wire cutter/stripper

…Wire nuts

… Electric drill with 5/16and 3/8bits … Phillips and flat blade screwdrivers

…Hammer

… Pliers

…Safety glasses

…Duct tape

… Tape to mount template

…Gloves to protect against sharp edges

… 120V 60Hz. 15 or 20 Amp, 2 wire with ground Properly grounded branch circuit

…Strain relief for junction cover

…8round metal duct, length to suit installation

…Saw, jig saw or reciprocating saw

Strain relief

Wire nuts

Spirit level

Electric drill with 5/16” and 3/8” Bits

Safety glasses

12” long Phillips head screwdriver

Saw, jig saw or

Masking tape reciprocating saw

Gloves

Knife

Wire

cutter/stripper

Hammer

Flat blade

screwdriver

8round metal duct,

length to suit

installation

REMOVE THE PACKAGING

CAUTION: LIFT THE HOOD OUT OF THE BOX BY THE CENTER METAL PORTION. DO NOT LIFT BY THE GLASS SIDES.

PRUDENCE : LEVEZ LA HOTTE À L’EXTÉRIEUR DE LA BOÎTE PAR LA PORTION MÉTAL CENTRAL. NE LEVEZ PAS PAR LES CÔTÉS DE VERRE.

CAUTION: Wear gloves to protect against sharp edges.

PRUDENCE : Portez des gants pour éviter les blessures causées par les tranchants.

Grasp the hood by the metal insert in the center and lift straight up and out of the box.

Remove and properly discard the plastic wrapping.

Remove parts box, duct covers and other packaging.

6

Page 7
Image 7
GE ZV900 Remove The Packaging, Tools And Materials Required Not Supplied, Installation Preparation