GE ZV900 Installation Instructions INSTALLATION-RECIRCULATING, Ductwork, Wiring Locations

Models: ZV900

1 21
Download 21 pages 17.52 Kb
Page 16
Image 16
Installation Instructions

Installation Instructions

INSTALLATION—RECIRCULATING

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.

Locate the template packed with the literature.

Measure 36from the floor to the top of the cooking surface. Add hood installation height determined on page 7. Mark that location.

IMPORTANT: Framing must be capable of supporting 100 lbs. Ceiling

Tape the template in position along the penciled line.

CHECK TO BE SURE THE TEMPLATE IS LEVEL.

Use a level to draw a line straight up, from the centerline on the template to the ceiling.

HOUSE WIRING LOCATION:

The junction box is located on the top left side of the hood.

Wiring should enter the back wall at least 22above the bottom of the hood, and within 6of the centerline.

1INSTALL FRAMING FOR HOOD SUPPORT

IMPORTANT: Framing must be capable of supporting 100 lbs.

View from rear

cleats

1” x 6” min.

mounting

support

Centerline of

installation

space

If drywall is present, mark the screw hole locations for the top mounting brackets. Remove the template.

Cut away enough drywall to expose 2 vertical studs at the bracket location indicated on the template.

Install a horizontal support at least 1x 6between two wall studs at the bottom mounting bracket installation location. The horizontal support must be flush with the room side of the studs. Use cleats behind both sides of the support to secure to wall studs.

Reinstall drywall.

15

Page 16
Image 16
GE ZV900 Installation Instructions INSTALLATION-RECIRCULATING, IMPORTANT Framing must be capable of supporting 100 lbs