Installation Instructions
7SIZE AND CUT DUCT PIECE
•Hold upper air deflector with duct connector against the ceiling.
• Measure from the bottom |
| |
of the air deflector to the |
| |
top of the hood as | Measure |
|
shown. Reduce that |
| |
length | Duct | |
dimension by 1″ to |
| |
facilitate installation. |
| length |
|
| |
The duct will cover |
|
|
and overlap the deflector |
| |
and the hood outlets. |
|
Deflector
• Cut the duct piece to size and slip onto the bottom of the deflector.
•Place the assembled deflector
and duct over the exhaust outlet.
•Hold the assembly against the duct bracket.
• Drive 4 screws into the bottom of the deflector and into the bracket.
•Use duct tape to seal duct to the deflector and at the exhaust outlet.
8 CONNECT ELECTRICAL
Verify that power is turned off at the source.
WARNING: If house wiring is not
AVERTISSEMENT :
Si la maison n’est pas câblee avec deux fils et un fil de terre, l’installateur doit installer un fil de terre. Quand les fils sont en aluminium, il faut prendre soin d’utiliser des connecteurs aluminium à cuivre avec une pâte antioxydante approuvée par U.L.
•Remove junction box cover and knockout on the left side.
Knockout
•Secure the house wiring to the junction box with a strain relief.
House wiring
•Connect white leads to branch circuit white lead.
•Connect black leads to branch circuit black lead.
•Connect green/yellow leads to branch circuit green lead or bare ground lead.
•Secure all connections with wire nuts on each electrical connector.
•Push wires into junction box and replace cover. Be sure wires are not pinched.
•Secure
18