GE ZV900 Install Mounting Bracket, Install Duct Bracket, Secure the bracket to the wall

Models: ZV900

1 21
Download 21 pages 17.52 Kb
Page 11
Image 11
2 INSTALL MOUNTING BRACKET

Installation Instructions

INSTALLATION—VENTED TO THE OUTSIDE

2 INSTALL MOUNTING BRACKET

This vent hood must be secured to the horizontal support or wall studs.

With the template taped in place, use a punch to mark mounting bracket screw locations.

Drill 3/16pilot holes in 2 of the punched locations in the lower bracket.

Remove the template.

Drill 2 (two) 3/16pilot holes through studs or rear wall support

14-5/8

to top of

bracket

C

L

REAR WALL

MOUNTING TEMPLATE

ALIGN BOTTOM EDGE

WITH PENCIL LINE,

INDICATING BOTTOM

OF THE HOOD

49-80405 04-06 JR

Use wood screws to secure the mounting bracket to the wall. The screws must engage wall studs or the installed horizontal mounting support.

Check to be sure that the bracket is level.

3 INSTALL DUCT BRACKET

The duct bracket should be installed against the back wall and flush with the ceiling. This bracket will hold the duct cover in place at the top.

Secure the bracket to the wall:

Align the marked centerline on the bracket with the centerline on the wall.

Mark 2 screw hole locations in the wall.

Drill 3/16pilot holes in the marked locations.

If pilot holes do not enter studs, enlarge the holes to 3/8and install wall fastener anchors.

Drive screws, by hand, into the fasteners to allow anchors to expand. Remove the screws.

Secure the bracket to the wall with wood screws and/or fasteners.

10

Page 11
Image 11
GE ZV900 installation instructions Install Mounting Bracket, Install Duct Bracket, Secure the bracket to the wall