GE ZV900 Installation Instructions INSTALLATION-RECIRCULATING, Avertissement, Prepare The Hood

Models: ZV900

1 21
Download 21 pages 17.52 Kb
Page 18
Image 18
Manual background

Installation Instructions

INSTALLATION—RECIRCULATING

4PREPARE THE HOOD

Place the hood on a padded surface.

Position the motor housing at the back of the hood. Electrical connectors should face the front, with rear mounting hooks at the back.

Slip the bottom flange of the motor housing into the side slots at the top rear opening.

Manual background Rear mounting

hooks

Rear view

Engage flange on motor

housing into slots

Carefully lay the hood on its back.

Fasten the hood to the motor housing from the bottom, using 6 screws.

Front side

Bottom view

Rear side

Join two cable connectors at the front of the hood.

To Lights

To

Control

Panel

5 MOUNT THE HOOD

WARNING: 2 people are required to lift and position the hood onto the mounting bracket.

AVERTISSEMENT :

If faut deux personnes pour lever et mettre en place la hotte sur le support de montage.

Lift the hood onto the mounting bracket.

Position a spirit level at the bottom of the hood to check side to side leveling.

6 LEVEL THE HOOD

This hood has built-in levelers on the mounting hooks at each side. Use a long Phillips screwdriver from the front to access the levelers.

Levelers Manual background

Use the top screw hole in the leveler to raise or lower the hood on that side.

Use the bottom screw hole to pull the hood tight against the wall surface.

Screw hole

Mark hole location at the bottom of the hood.

Remove the hood. If the bottom screw hole does not enter a stud, enlarge the hole to 3/8and install wall fastener anchors.

Place the hood back onto the mounting bracket, check level again and install the wall fastener.

17

Page 18
Image 18
GE ZV900 Installation Instructions INSTALLATION-RECIRCULATING, Avertissement, Prepare The Hood, Mount The Hood