Installation Instructions

STEP 2 CONNECT ELECTRICAL

Verify that power is turned off at the source.

WARNING:If house wiring is not 2-wire with a ground wire, an electrician will need to convert existing wiring to meet these specs. When house wiring is aluminum, be sure to

use U.L.-approved anti-oxidant compound and aluminum-to-copper connectors.

1.Place insert sleeve on padded, yet stable, surface below cutout (can use flattened carton to pad surface).

2.Remove the junction box cover.

Wires

3.Pull house wires through wall of insert sleeve and attach the strain relief. Thread the house wire through the junction box.

Connect

4.Connect white leads to branch circuit white lead.

5.Connect black leads to branch circuit black lead.

6.Connect green/yellow leads to branch circuit green lead.

7.Secure all connections with wire nuts on each electrical connector.

Cover

Screws

8.Carefully push wires into junction box and replace cover.

9.Secure junction box cover with original screws.

18

Page 18
Image 18
GE ZVC36, ZVC42, ZVC48, ZVC30 installation instructions Connect Electrical, Verify that power is turned off at the source