GE ZVC36 Island Installation Preparation, CONSTRUCT CEILING SUPPORT for Island Installation

Models: ZVC30 ZVC36 ZVC48 ZVC42

1 68
Download 68 pages 13.2 Kb
Page 14
Image 14
Island Installation Preparation

Island Installation Preparation

CONSTRUCT CEILING SUPPORT (for Island Installation)

Plan the Location of the Hood and Ductwork

The ceiling structure must be capable of supporting the weight of the insert sleeve (approximately 100 pounds), the canopy itself, any mounting hardware and any inadvertent user contact loads.

• Use a plumb bob to check the location. The countertop/cooktop below the insert sleeve must be centered with the insert sleeve.

Ceiling

 

Hood

 

ducting

 

centerline

Front

 

 

*30Minimum required

Align with

*36Maximum recommended

installation height

center of

Cooktop

cooktop

 

Countertop

 

Front view

*Always refer to the cooktop or range installation instructions for product-specific clearances.

The insert sleeve in the canopy must be centered left to right over the cooktop.

*30Minimum required

*36Maximum recommended installation height

Left side view

Illustrations not to scale

If desired, install the control in a remote location using the supplied mounting hardware. See the following pages for detailed instructions for mounting the control remotely.

Refer to Ceiling Ducting on page 13 for ductwork installation.

IMPORTANT: The exhaust outlet in the top of the insert sleeve is not centered; it is positioned closer to the back side. Therefore, the insert sleeve may not be centered front to back in the canopy. A custom liner constructed by the cabinet supplier is usually required for island installations.

NOTE: It is recommended that the custom hood insert be purchased and on-site before the canopy is constructed.

14

Page 14
Image 14
GE ZVC36, ZVC42, ZVC48, ZVC30 Island Installation Preparation, CONSTRUCT CEILING SUPPORT for Island Installation