GE ZVC48, ZVC42 Advance Planning, Power Supply, Ductwork Planning, Custom Cabinet Frame Planning

Models: ZVC30 ZVC36 ZVC48 ZVC42

1 68
Download 68 pages 13.2 Kb
Page 9
Image 9
Advance Planning

Advance Planning

ADVANCE PLANNING

Ductwork Planning

•This hood is equipped for 8round ductwork. •Determine the exact location of the vent hood. •Plan the route for venting exhaust to the outdoors.

This hood is not designed for a recirculating venting operation.

•Use the shortest and straightest duct route possible. For satisfactory performance, duct run should not exceed 100 ft . equivalent length for any duct configurations.

•Refer to “Duct Fittings” chart to compute the maximum permissible length for duct runs to the outdoors.

•Use rigid metal ductwork only.

•Install a wall or roof cap with damper at the exterior opening. Order the cap and any transitions needed in advance.

Wall and Ceiling Framing for Adequate Support This vent hood is heavy and the cabinet structure needs to support the weight of the loaded insert sleeve. Adequate structural support must be provided in all types of installations.

•Installation will be easier if the vent hood is installed before the cooktop is installed.

Custom Cabinet Frame Planning

•The custom-built canopy should be sized to accommodate the hood insert sleeve. See pages 5–9 for details.

Remote Mounting of the Control (Wired)

•The control can be remotely mounted on the wall or the countertop.

•It is recommended that you use a professional installer for the countertop cutout .

•It is recommended that the cutout in a granite countertop or other hard surface be made before the countertop is installed.

•The cutout needs to be made at least 6 inches from the edges of the countertop.

•If mounting in the countertop above a drawer, consideration must be given to the depth of the control mounting assembly.

•A 30 ft . wire cord is provided. Careful consideration must be given to the location of the remotely mounted control.

•It is recommended that the 4-wire cord be routed through 1conduit between the insert sleeve and the remote mounting location.

POWER SUPPLY

IMPORTANT - (Please read carefully)

ADVANCE PLANNINGWARNING:

FOR PERSONAL SAFETY, THIS APPLIANCE MUST BE PROPERLY GROUNDED.

Remove house fuse or open circuit breaker before beginning installation.

Do not use an extension cord or adapter plug with this appliance. Follow National electrical codes or prevailing local codes and ordinances.

Electrical Supply

This vent hood must be supplied with 120V, 60Hz, and connected to an individual, properly grounded branch circuit, and protected by a 15 or 20 amp circuit breaker or time delay fuse.

Wiring must be 2 wire with ground.

If the electrical supply does not meet the above requirements, call a licensed electrician before proceeding.

Route house wiring as close to the installation location as possible, in the ceiling or back wall.

Connect the hood wiring to the house wiring in accordance with local codes.

House wiring must extend to 45minimum from bottom of cabinet in order to make connection to hood wiring.

Grounding Instructions

The grounding conductor must be connected to

a grounded metal, permanent wiring system, or an equipment-grounding terminal or lead on the hood.

Ductwork PlanningWARNING:The improper connection of the equipment-grounding conductor can result in a risk of electric shock. Check with a qualified electrician or service representative if you are in doubt whether the appliance is properly grounded.

9

Page 9
Image 9
GE ZVC48, ZVC42, ZVC36 Advance Planning, Power Supply, Ductwork Planning, Custom Cabinet Frame Planning, Electrical Supply