MOUNTING THE OPERATOR:

MOUNTING THE OPERATOR:

1.Getting started.

Position assembled rail on wall next to header bracket. (Fig. 2-4).

Place material on floor under power head to protect from scratching. (A box, stool, or similar device may be needed to clear a torsion spring.)

NOTE: For header bracket pins locate Bag 2 from Box 1.

2.Mounting the assembly.

Attach rail to header bracket using clevis pin and cotter pin.

Support power head on step-ladder to prevent interference with header mounted spring

HEADER BRACKET

 

VIEW

 

FROM ABOVE

 

(not to scale)

NO

NO

 

YES / / OUI

FIG. 2-4 Position assembly and align.

(Fig. 2-5).

NOTE: Before final attachment to ceiling, insure that assembly is in proper alignment (Fig. 2-4).

NOTE: For nuts, bolts, and lag screws locate Bag 3 from Box 1.

On finished ceilings, locate ceiling joists or trusses using a stud finder or similar device. Attach angle iron (not provided) to joists or trusses through finish material using (provided) lag screws (Fig. 2-6).

On unfinished ceilings or open ceilings, straps may attach directly to joists or trusses. Depending on the garage construction, extra framing material (not provided) may be required which should be installed using appropriate construction techniques

(Fig. 2-6).

NOTE: Refer to your local building codes for appropriate construction techniques.

Attach mounting straps to ceiling using lag bolts (Fig. 2-6).

Set height of power head to following:

(Fig. 2-6).

a)Rail must clear door at door’s highest point of travel.

b)Be level or power head slightly below level.

Securely tighten power head mounting bolts and nuts.

Lower door.

Check that rail clamp bolts and nuts are tight.

DO NOT PLUG UNIT IN YET!

COTTER PIN

CLEVIS PIN

FIG. 2-5 Rail mounting to header bracket.

ANGLE IRON ON FINISHED CEILING

 

DRYWALL

 

Attach angle iron to beams

UNFINISHED OR OPEN BEAM

Extra framing

not needed

 

Mounting Straps

 

(not provided)

 

bolts & nuts

 

Extra framing

bolts & nuts

NEEDED

FIG. 2-6 Mounting the power head.

12

PN# 3642036212, 8/09/2007

 

Page 12
Image 12
Genie 1024, 1022 Mounting The Operator, Angle Iron On Finished Ceiling, Unfinished Or Open Beam, Extra framing, not needed