IMPORTANT INSTALLATION INSTRUCTIONS
WARNING: Toreduce the risk of severe injury or death:
1.READ AND FOLLOW ALL SAFETY, INSTALLATION AND OPERATION INSTRUCTIONS. (If you have questions or do not understand an instruction, call The Genie Company or an authorized Genie Dealer.)
2.Install only on a properly balanced sectional garage door. An improperly balanced door could cause severe injury. Have a professionally trained service technician make repairs to cables, spring assemblies, and other hardware before installing the opener.
3.Remove all ropes and remove or make inoperative all locks connected to the garage door before installing opener.
4.Where possible, install the door opener 7 feet or more above the floor. For products having an emergency release, mount the emergency release 6 feet above the floor.
5.Do NOT connect the operator to source of power until instructed to do so.
6.Locate the control button:•Within sight of door,
•At minimum height of 5 feet so small children are not able to reach it, and
•Away from all moving parts of the door.7.Install the Entrapment WARNING Label next to the control button in a prominent location. Install the Emergency Release Marking on or next to the emergency release.
8.After installing the opener, the door must reverse when it contacts a
1OPERATOR ASSEMBLY
RAIL ASSEMBLY: Use a clean, flat surface.
WARNING
To reduce the risk of injury to persons or damage to property - Use this operator only with sectional doors.
CAUTION
Do NOT run until operator is fully assembled.
NOTE: Three (3) piece rail assemblies are for a 7 foot high door.
Clear a workspace area to unpack and organize box and contents for assembly.
1.There are 4 boxes inside the carton. Each box is numbered 1 - 4. Note that some operators will contain the same parts and be packaged with fewer boxes. Carefully remove the three internal boxes (Labeled #1, 2, and 3) and place them on the floor for easy access. (Fig.
2.Remove the motor power head and place it on the floor for later use. Remove box #4 and place it on the floor for later use.
NOTE: For
FOR
|
|
| #4 |
Bag 0 | Rail Connectors | Bag 2 | Header Bracket |
| |||
|
| ||
Rail Connector Bolts |
|
| |
|
| Header Bracket |
|
|
| Bolts |
|
| Rail Connector Nuts |
|
|
|
|
| Lag Srews |
Bag 1 | Bolts | Bag 3 |
|
Rail |
| ||
|
| Mounting |
|
|
| Straps |
|
|
| 5/16" Nuts |
|
|
| & Bolts |
|
| Power head |
|
|
| Box Label Example |
| |
FIG. | Internal boxes. |
|
|
PN# 3642036212, 8/09/2007 | 9 |
|