33.Wrap the Leg Lever Cable (51) over a 90mm Pulley (48). Attach the Pulley, a Cable Trap (56), and two Half Guards (55) to the second hole from the bottom of the Pulley Plates (60) with an M10 x 50mm Bolt (97) and an M10 Nylon Locknut
(77). Make sure that the Cable Trap and the
Half Guards are oriented as shown.
34.Wrap the Leg Lever Cable (51) under a 90mm Pulley (48). Attach the Pulley to the Base (1) with an M10 x 45mm Bolt (86), two Half Guards (55), and an M10 Nylon Locknut (77).
35.Wrap the Leg Lever Cable (51) over a 90mm Pulley (48). Attach the Pulley to the Double “U”- bracket (61) with an M10 x 45mm Bolt (86), two Half Guards (55), and an M10 Nylon Locknut (77).
33 |
| |
60 | 55 | |
77 | ||
97 | ||
55 | ||
| ||
56 | 48 | |
| ||
51 |
| |
34 |
| |
51 |
| |
48 |
| |
86 |
| |
55 |
| |
1 55 | 77 | |
35 |
| |
77 |
| |
61 |
| |
55 |
| |
48 |
| |
51 |
| |
| 86 | |
| 55 |
20