12.Attach the Butterfly Frame (5) to the Top Frame

(4) with two M8 x 80mm Bolts (100), two M8 Washers (103), and two M8 Nylon Locknuts (78).

Do not tighten the Nylon Locknuts yet.

Attach the Butterfly Frame (5) to the Butterfly Frame Brace (6) with an M10 x 75mm Button Screw (118).

13.Grease to the locations shown and attach the Left Butterfly Bracket (28) to the Butterfly Frame (5) with an M10 x 80mm Bolt (84) and an M10 Nylon Locknut (77).

Repeat this step for the Right Butterfly Bracket (29).

See steps 2–13. Tighten the Nylon Locknuts (77, 78, 107).

14.Attach a Butterfly Handle (27) to the Left Butterfly Arm (25) with an M10 x 65mm Button Bolt (106), two M10 Washers (80), two 13mm Steel Spacers (109), and an M10 Nylon Locknut (77).

Secure the Left Butterfly Arm (25) with an M10 x 82mm Button Screw (92) and an M10 Large Washer (105).

Repeat this step for the Right Butterfly Arm and Butterfly Handle (26, 27).

12

100

 

 

 

 

 

 

 

103

 

 

103

 

 

 

4

 

 

 

5

 

 

 

 

6

 

 

 

78

 

 

118

 

 

13

 

 

 

 

 

84

 

 

 

Grease

 

 

29

 

 

 

5

 

 

 

77

28

 

 

 

 

14

 

 

 

 

 

25

77

 

 

 

 

27

 

80

 

 

109

109

 

26

27

 

80

 

 

 

 

 

106

 

 

 

105

 

 

 

92

 

13

Page 13
Image 13
Gold's Gym GGSY3058.0 manual 100 103 118 Grease 109 106 105