R
CB 1200 Pellet Stove
C. Tools And Supplies Needed
Tools and building supplies normally required for installation, unless installing into an existing masonry fireplace:
Reciprocating Saw | Safety Glasses |
Channel Locks | Framing Square |
Hammer | Electric Drill & Bits (1/4”) |
Phillips Screwdriver | 1/4” |
Tape Measure |
|
Plumb Line | May also need: |
Level | Vent Support Straps |
Framing Material | Venting Paint |
| |
Gloves |
|
WARNING
Inspect appliance and components for damage. Damaged parts may impair safe operation.
•Do NOT install damaged components.
•Do NOT install incomplete components.
•Do NOT install substitute components.
Report damaged parts to dealer.
WARNING
Fire Risk.
Hearth & Home Technologies disclaims any responsibility for, and the warranty will be voided by, the following actions:
•Installation and use of any damaged appliance.
•Modification of the appliance.
•Installation other than as instructed by Hearth & Home Technologies.
•Installation and/or use of any component part not approved by Hearth & Home Technologies.
•Operating appliance without fully assembling all components.
•Operating appliance without legs attached (if supplied with unit).
•Do NOT Overfire
D. Inspect Appliance & Components and Pre-Use Check List
1. |
| Place the appliance in a location near the |
|
| final installation area and follow the proce- |
|
| dures below: |
2. |
| Open the appliance and remove all the parts |
|
| and articles packed inside the Component |
|
| Pack. Inspect all the parts and glass for ship- |
|
| ping damage. Contact your dealer if any irregu- |
|
| larities are noticed. |
3. |
| All safety warnings have been read and fol- |
|
| lowed. |
4. |
| This Owner’s Manual has been read. |
5. |
| Floor protection requirements have been met. |
6. |
| Venting is properly installed. |
7. |
| The proper clearances from the appliance and |
|
| chimney to combustible materials have been |
|
| met. |
8. |
| The masonry chimney is inspected by a profes- |
|
| sional and is clean, or the factory built metal |
|
| chimney is installed according to the manufac- |
|
| turer’s instructions and clearances. |
9. |
| The chimney meets the required minimum |
|
| height. |
10. |
| All labels have been removed from the glass |
|
| door. |
11. |
| Plated surfaces have been wiped clean, if |
|
| applicable. |
12. |
| Thermostat or remote has been installed. |
13. |
| A power outlet is available nearby. |
Or any such action that may cause a fire hazard.
Page 6 | September 1, 2008 |