Heat & Glo LifeStyle SUPREME-P-I30AU E. Installing Adaptor and Termination Cap, Masonry

Models: SUPREME-P-I30AU SUPREME-N-I30AU

1 60
Download 60 pages 51.13 Kb
Page 26
Image 26

E. Installing Adaptor and Termination Cap

For installation of termination cap see minimum vent heights for various pitched roofs (see Figure 8.5).

To install adaptor see Figure 8.8.

 

 

 

 

 

 

 

 

 

 

 

 

 

HORIZONTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

OVERHANG

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

610 mm MIN.

 

 

510 mm MIN.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VERTICAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WALL

 

 

 

 

 

 

 

 

 

LOWEST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DISCHARGE

 

 

 

 

 

 

 

 

 

OPENING

TERMINATION

 

 

 

 

 

 

 

 

 

 

 

 

CAP

 

 

 

 

 

 

 

 

 

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

305 mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ROOF PITCH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS X/ 305 mm

 

 

 

 

 

 

 

 

H (MIN.) - MINIMUM HEIGHT FROM ROOF

 

 

 

 

 

 

 

 

TO LOWEST DISCHARGE OPENING

Angle

H (Min.) mm

Angle

H (Min.) mm

0°-26.6°

500*

42.5°-45.0°

1220

26.6°-30.3°

500*

45.0°-49.4°

1520

30.3°-33.7°

500*

49.4°-53.1°

1830

33.7°-36.9°

610*

53.1°-56.3°

2130

36.9°-39.8°

760

56.3°-59.0°

2290

39.8°-42.5°

990

59.0°-60.3°

2440

 

*910 mm minimum in snow regions

 

Figure 8.5 Minimum Height from Roof to Lowest Discharge Opening

CAUTION! Risk of Cuts/Abrasions/Flying Debris.

Wear protective gloves and safety glasses during instal- lation. Sheet metal edges are sharp.

Damper Flashing Kit (Optional)

For use with LINK-DV30B Liner Kit. See Figure 8.6. Note: Damper may have to be removed to use this kit.

Run flex liners through 3 in. (76 mm) holes in damper flashing.

Attach damper flashing to firebox roof with self tapping screws included in kit.

CLASS A PIPE

FLASHING

Figure 8.6

To prevent odors and cold drafts, the chimney must be sealed around the vent with non-combustible blanket insulation or field fabricated metal plates.

Masonry

LINK-DV30B

Factory Built

 

 

 

 

Installation

Wood Burning

APPLY SEALANT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TERMINATION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CAP

EXHAUST

 

 

 

 

 

 

 

OPTIONAL LINK-ZC-ADPB

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FOR USE WITH CLASS A

AIR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VENT PIPE

 

 

 

 

 

 

 

WOODBURNING PIPE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SEAL GAP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AROUND FLEX PIPE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

APPLY SEALANT

Note: Untwist the pipe while extending it, to achieve full 30 ft. (9 m) length.

INLET AIR

VENT PIPE

Remove 18 in. x 18 in. (457 mm x 457 mm) flashing on cap by re- moving 3 screws. Connect both the LINK-ZC-ADPB to Class A Pipe

Figure 8.7and the termination cap to the LINK-ZC-ADPB with the self tapping screws provided.

26

Heat & Glo • Supreme-N-I30AU, Supreme-P-I30AU2222-900 Rev. P • 6/12

Page 26
Image 26
Heat & Glo LifeStyle SUPREME-P-I30AU E. Installing Adaptor and Termination Cap, Masonry, Factory Built, Wood Burning