Heat & Glo LifeStyle VRT-BZ-P-AUB, VRT-GY-N-AUB, VRT-GY-P-AUB, VRT-BZ-N-AUB H. Flue Termination

Models: VRT-BZ-P-AUB VRT-GY-N-AUB VRT-BZ-N-AUB VRT-GY-P-AUB

1 75
Download 75 pages 49.02 Kb
Page 50
Image 50
H. Flue Termination

If the area above the ceiling is NOT an attic, position and secure the ceiling firestop on the ceiling side of the previously cut and framed hole.

JOIST

CEILING

NAILS (4 REQUIRED)

CEILING FIRESTOP

Figure 10.15 Ceiling Firestop (Ceiling Side)

If the area above the ceiling IS an attic, position and secure the firestop on top of the previously framed hole.

NAILS (4 REQUIRED)

RAFTER

CEILING

CEILING FIRESTOP

Figure 10.16 Attic Firestop

H. Flue Termination

For Horizontal Terminations using the SLP-TRAP

To attach and secure the termination to the last section of horizontal flue:

The rear flue heat shield MUST be placed 1 in. (25.4

mm)above the top of the flue between the wall shield and the base of the termination cap.

One section of the heat shield is attached to the wall shield. The other is attached to the termination cap in the same manner (see Figure 10.17).

The heat shield sections will overlap to match the wall thickness (depth).

If the wall thickness does not allow the required 1-1/2 in. (38

mm)heat shield overlap, an extended heat shield must be used. The extended heat shield will need to be cut to the thickness of the wall and be attached to the wall shield.

The small leg in the shield rests on top of the flue to properly space it from the pipe section (see Figure 10.17).

Interior

Rear Flue

Heat Shield

Wall Shield

38 mm min.

 

 

overlap

Outer Flue

 

Inner Flue

 

INTERIOR

EXTERIOR

Figure 10.17 Venting through the Wall

 

The termination kit should pass through the wall firestops from the exterior of the building.

Adjust the termination cap to its final exterior position on the building and interlock the flue sections.

WARNING! Risk of Fire! the termination cap must be positioned so that the arrow is pointing up.

Use a high-temperature sealant gasket to seal between the pipe and exterior firestop.

1 in. (25.4 mm)

7-1/2 in.

(192 mm)

MINIMUM

Figure 10.18 Termination Cap

Cap Specification Chart

(depth without using additional pipe sections)

 

SLP-TRAP2

VRT-AUB

Rear Vent Depth

5-1/2 in. (139 mm) to 9-1/2 in. (241 mm)

SLP-TRAP2 can adjust 4 in. 102 mm (5-3/8 to 9-3/8) (137 mm to 238 mm)

50

Heat & Glo • VRT-AUB2123-980 Rev. H • 5/12

Page 50
Image 50
Heat & Glo LifeStyle VRT-BZ-P-AUB, VRT-GY-N-AUB H. Flue Termination, For Horizontal Terminations using the SLP-TRAP