PRO3 Side Mount Packaged Refrigeration System
Connections
XR40CX
The
The digital input configurable as third probe is present in the following codes: XR40CX- xx4xx, XR40CX
8A compressor
9 1 0 1 1 1
8(3)A250V 8(3)A250V
1 | 3 | 4 | 5 | 6 | 7 | 8 |
| N.C. |
|
|
|
| Hot Key/IV Probe |
|
|
|
|
| ||
Def | Comp |
| TTL or | |||
|
| |||||
|
|
|
Line |
20A compressor
9 1 0 1 1 1
8(3)A250V 20(8)A250V
1 | 3 | 4 | 5 | 6 | 7 | 8 |
| N.C. |
|
|
|
| Hot Key/IV probe |
|
|
|
|
| ||
Def | Comp |
| TTL or | |||
|
| |||||
|
|
|
Line |
XR60CX
The
The digital input configurable as third probe is present in the following codes: XR60CX- xx4xx, XR60CX
8A or 16A comp. relay - 230 VAC
|
|
|
|
|
|
|
|
| Evap. | Room |
|
|
|
| 8(3)A |
|
|
| 9 | 10 11 12 | |
Max | 8(3)A250V~ |
|
|
|
|
|
|
| ||
16A |
|
|
|
|
|
|
|
|
|
|
| 1 | 2 | 3 | 4 | 5 | 6 | 6 | 7 |
|
|
|
|
| N.C. |
|
|
|
| Hot Key/IV probe/ |
| |
|
| Def | Fan Comp |
|
| TTL or | ||||
Line |
|
|
|
| ||||||
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
NOTE: The compressor relay is 8(3)A or 16(6)A according to the model.
20A comp. relay - 230 VAC
Service Information
All PRO3 packaged refrigeration system units are designed for maximum durability, reliability and simplicity. The PRO3 packaged refrigeration system comes to you ready for operation, fully charged and with all controls preset at the factory. The following information is provided as an aid in the event that service is required.
Maintenance
The evaporator section of a PRO3 packaged refrigeration system should be checked at least once for proper defrosting because the amount and pattern of frosting can vary greatly.
The frost
System Standard Maintenance Guidelines
After first year of operation and under normal usage, maintenance should cover the following items at least once every six months:
1.Check and tighten ALL electrical connections.
2.Check all wiring and insulators.
3.Check contactors for proper operation and for worn contact points.
4.Check all fan motors. Tighten motor mount bolts/ nuts and tighten fan set screws.
5.Clean the condenser coil surface.
6.Check the operation of the control system. Make certain all safety controls are operating properly.
7.Check all defrost controls for proper function.
8.Clean the evaporator coil surface.
9.Clean the drain pan and check the drain pan and drain line for proper drainage.
CAUTION: Unit is critically charged, care must be taken not to reduce the system refrigerant charge while taking pressure readings. Technician must compensate for any refrigerant that might escape the unit into the gauge tubing.
Evap.
Room
Max |
| 20(8)A250V~ |
|
|
| 9 | 10 11 12 | |
5(1)A |
|
|
| 8(3)A250V~ |
| |||
20A |
|
|
|
| ||||
|
|
|
|
|
|
| ||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|
|
|
| Hot Key/IV probe |
Line | Fan Comp | Def | N.C.TTL or. |
PRO3 Side Mount Packaged Refrigeration System Installation and Operations Manual, May 2008 | 13 |