Heatcraft Refrigeration Products PRO3 manual Manual, Installation and Operations

Models: PRO3

1 24
Download 24 pages 16.53 Kb
Page 16
Image 16
Installation and Operations

16

CC

BLACK

T1 L1

T2 L2

BLACK

PFC WN

L1 T1

CFM 1

CFM 2

LEFTRIGHT

TOP VIEW OF CONDENSING UNIT

 

 

5

1

2

SR

 

 

2

1

 

C

 

3

SC

PRIMARY SINGLE PHASE PROTECTION PROVIDED

USE COPPER CONDUCTORS ONLY

208-230V/1phase/60HZ

GND

REFRIGERATION

CONTROLLER

1 2 3 4 5 6 7 8

EFM

 

 

T1

T2

T3

 

 

 

 

BLUE

 

 

 

 

 

 

YELLOW

 

 

WN

 

WN

 

DLT

 

WN

 

 

 

 

 

 

 

 

 

DLH

 

 

 

 

YELLOW

YELLOW

BLUE

GRAY

GRAY

 

WHITE

 

YELLOW

 

 

CCH

 

 

 

 

 

 

 

BLACK

 

 

 

 

BLACK

 

 

 

SW

 

 

HPS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CC

 

ORANGE

BLUE

 

 

 

 

 

 

 

EVAP TEMP

BLUE

ROOM TEMP

YELLOW

9 10 11 12

Diagram 2 Wiring Diagram High Temperature Cooler Air Defrost Small Cabinet

Installation and Operations

R S

RC

COMPRESSOR

CC-- COMPRESSOR CONTACTOR

CCH -- CRANKCASE HEATER CFM -- CONDENSER FAN MOTOR DH -- DEFROST HEATER

DLH -- DRAIN LINE HEATER

DLT -- DRAIN LINE THERMOSTAT EFM -- EVAPORATOR FAN MOTOR GND -- GROUND

LEGEND

HL --

HEATER LIMIT THERMOSTAT

RT --

ROOM THERMOSTAT

TFC --

TEMPERATURE FAN CYCLE SWITCH

HPS --

HIGH PRESSURE SWITCH

SC --

START CAPACITOR

WN --

WIRE NUT

PFC --

PRESSURE FAN CYCLE SWITCH

SR --

START RELAY

 

 

RC --

RUN CAPACITOR

SW --

SWITCH

 

 

FACTORY WIRING FIELD WIRING

Manual

Page 16
Image 16
Heatcraft Refrigeration Products PRO3 manual Manual, Installation and Operations