
English
INSTALLING TONGUE AND GROOVE FLOORING
Caution regarding use of this Tool to install
This Tool was designed for use in installing unfinished hardwood flooring. It can be used to install
After squaring the floor and allowing for expansion as recommend‑ ed by the Wood Flooring Industry (NWFA, NOFMA and MFMA), install felt vapor barrier and use chalk line to identify location of subfloor nails prior to racking wood to be installed. This will help prevent hitting subfloor nails which can cause damage to the driver blade and jamming. Place the grooved edge of the first row of flooring towards the wall on the side of the room from which you are starting.
Face nail first four (4) rows of flooring.
Install the tongue and groove shoe.
Place the groove of the fifth row of flooring over the tongue of the fourth row of flooring and tighten using the hammer. Depress the safety trigger, and tap ram head of the Tool with the tongue and groove shoe installed.
Slide the Tool along the tongue of the flooring to the location at which you desire to place the next fastener.
Continue until you have completely fastened all but the last five (5) rows of flooring.
Install and face nail in place the remaining five (5) rows of flooring.
— 25 —