Installation, Operation and Care of
MODEL HPGF15 GAS PRESSURE FRYERS
SAVE THESE INSTRUCTIONS FOR FUTURE USE
GENERAL
Your Hobart Gas Pressure Fryer will produce a uniform,
Standard equipment includes a drain pipe extension for the exhaust tank, wooden doughnut stick, 11/4" diameter exhaust pipe, solenoid open wrench, insulated mitts, and flexible cleaning rod. Both legs and casters are supplied with each fryer. Extra
Model HMF50 or HMF85 Filtering System for draining and filtering the oil for Model HPGF15 Gas Pressure Fryer is available as an option.
IMPORTANT: Your pressure fryer must be cleaned frequently or it will not function properly. Follow the procedures in the CLEANING section of this manual.
INSTALLATION
When installing this pressure fryer, the base should remain open at the front to allow air circulation for the gas burner. DO NOT BLOCK THE FRONT OF THE FRYER.
Prior to installation, verify that the electrical and gas supply agree with the specifications on the fryer data plate, which is located on the inside of the door.
UNPACKING
Immediately after unpacking the pressure fryer, check it for possible shipping damage. If this fryer is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.
Do not use the door to lift or move the fryer.
– 4 –