"F-A" Control Board Sequence Flow Chart

FS-1022MLH-C/SRC-10H

2.

1. Startup

Power Switch "ON" Control Switch in "ICE" POWER OK LED on IS Green LED on

IS Yellow LED off

4. 1-in-12 Drain Cycle - Although the factory default 1-in-1 drain cycle

1.Fill Cycle is recommended, a 1-in-12 drain cycle is available. For 1-in-12 drain

 

If Fill > 90 sec.

cycle sequence, see "3. 1-in-12 Hour Drain Cycle & Restart (optional)."

 

 

 

 

 

 

 

 

 

 

 

 

FT 1-beep alarm

 

 

 

 

 

 

 

 

 

 

 

sounds.

 

 

 

 

 

 

 

 

 

 

 

When UF/S

2. Ice Purge Cycle

 

 

 

 

 

 

 

 

 

 

closes alarm

 

3. Freeze Cycle

 

To bypass, press the

1-in-1 drain cycle. DV opens for 2 seconds every

 

resets and

 

"SERVICE" button

hour (S1 Dip Switch 4).

 

 

 

2. Ice Purge

 

 

 

Refill

 

after GM starts.

Icemaker status

 

Cycle starts.

 

 

 

 

 

 

 

 

 

does not change.

FT Maximum

 

Maximum

30 sec.

5 minutes

90 seconds

 

 

 

 

90 seconds

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FT terminates

 

 

 

 

 

 

 

 

 

 

 

(90 sec.)

Low Water Safety

When UF/S closes,

 

 

 

90 sec. FT exceeded

alarm resets and

1-beep alarm sounds

2. Ice Purge Cycle

90 sec. PT begins

starts.

90 seconds

 

 

 

 

 

 

 

 

 

FT

PT

terminates

 

exceeded

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sequence Flow Chart

15

WV energizes

FT starts (90 sec.)

LF/S closed

EH energizes

PDS energizes

UF/S open

LF/S closed

UF/S open

UF/S closed

GM energizes

CLPS closes

LF/S open

UF/S closed

FT exceeded

FT terminates

 

Comp energizes

FT starts (90 sec.)

FT terminates

1-beep alarm sounds

WV de-energizes

 

FMR energizes

WV energizes

WV de-energizes

PDS de-energizes

 

 

EH continues

Comp continues

Comp continues

CLPS opens

 

 

GM continues

EH continues

EH continues

Comp de-energizes

 

 

 

FMR continues

FMR continues

FMR de-energizes

 

 

 

GM continues

GM continues

EH continues

 

 

 

PDS continues

PDS continues

GM continues

 

 

 

 

 

WV continues

1-beep alarm continues WV continues

EH de-energizes

GM de-energizes

2. Infrared Sensor Shutdown & Restart

 

Note: If IS fails to shutdown the

 

 

 

1. Bin Full

 

 

 

 

 

 

2. Ice Purge Cycle

 

3. Icemaker Off

 

 

 

4. Icemaker Restart

 

icemaker, MBC opens and a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9-beep alarm sounds.

 

 

 

IS delay determined by S1 dip switch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1, 2, 3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS Green LED on

 

 

 

 

 

IS Green LED on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS Green LED on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS Yellow LED off

 

 

 

 

 

 

 

IS Yellow LED (flashing or steady)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS Yellow LED off

 

 

 

 

 

 

 

 

 

5 minutes

 

 

 

 

 

 

 

 

 

3. 1-in-12 Drain Cycle

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

to "2. Ice Purge Cycle" above

 

 

 

 

1. DT Initiates DC

 

 

 

 

 

 

2. Ice Purge Cycle

 

3. 10-Minute

 

 

 

4. Icemaker Restart

 

& Restart (optional)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Drain

 

 

 

 

 

 

to "1. Fill Cycle" above

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(S1 dip switch 4)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS activated or DC starts

DV energizes (DC only) 10-min. DT terminates (DC only)

 

 

 

 

 

 

 

 

 

 

 

 

 

PDS de-energizes

GM de-energizes

DV de-energizes (DC only)

 

Legend:

 

 

 

 

 

 

 

 

 

CLPS-control low-pressure switch

LF/S-lower float switch

CLPS opens

 

 

 

 

 

1-in-12 DT reset (DC only)

 

Comp-compressor

MBC-mechanical backup

Comp de-energizes

 

 

 

 

 

 

 

 

 

 

 

 

 

DC-drain cycle

 

 

 

 

bin control

FMR de-energizes

 

 

 

 

 

 

 

 

 

 

 

 

 

DT-drain timer

PDS-pump-down solenoid valve

GM continues

 

 

 

 

 

 

 

 

 

 

 

 

 

DV-drain valve

PT-purge timer

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EH-evaporator heater

UF/S-upper float switch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FMR-fan motor-remote

WV-water valve

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FT-fill timer (low water safety)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GM-gear motor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS-infrared sensor bin control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 15
Image 15
Hoshizaki service manual Control Board Sequence Flow Chart FS-1022MLH-C/SRC-10H