Quick Installation

2-5

Quick Installation Follow the general steps outlined in Table 2-2 to install and configure the for Managed Hubs Edge Router module in a managed ONline or ONcore hub.

Table 2-2 Quick Installation for Managed Hubs

Step

Procedure

Refer to:

 

 

 

1

Unpack the module.

Unpacking Procedures on page 2-6

2

Verify the jumper plug positions on

Verifying Jumper Plug Positions on

 

the base and expansion engines

page 2-7

3Insert the module into an open slot in the hub.

The appropriate installation instructions for your hub type in this chapter

4

Configure the carrier for possible

Configuring DIP Switches on page 2-8

 

operation in an unmanaged hub.

 

5Attach a management terminal to the Edge Router console port.

6Configure the carrier using network management commands.

7

Configure the engine parameters

Cisco Systems Getting Started Guide

 

using Cisco Systems setup

 

 

command.

 

8

Attach WAN cables to the 60-pin

Cable Pinouts on page A-5

 

universal WAN connectors on the

 

 

front panel.