Installing the ONcore Edge Router Module

2-13

4Using your fingers, tighten the two spring-loaded screws on the front of the module faceplate (Figure 2-4). Do not overtighten.

Board guide

Screws

Hub backplane

Board guide

Faceplate

 

Figure 2-4 Installing the Edge Router Module in an ONline Hub

 

 

Installing the

You do not need to power off the ONcore hub to install or remove the

ONcore Edge

Edge Router module. You can insert the module while the hub is operating

Router Module

(this is called a hot swap).

 

To install the Edge Router module in an ONcore hub:

1Use one of the following proper grounding techniques when you install the Edge Router module:

Properly ground yourself prior to handling the module.

Attach a static wrist guard to yourself or touch a grounded static mat prior to handling the module.

If you already have a management terminal connected to your ONcore hub, you can verify the hub has enough power for the new Edge Router module by entering the SHOW POWER BUDGET command. Refer to Appendix A for details on power requirements.

Refer to the ONcore Distributed Management Module Commands Guide for information on the SHOW POWER BUDGET command.

2Locate an open slot in the ONcore hub. If necessary, remove a blank panel to expose a slot.

Page 37
Image 37
HP 2103R-CSDI manual ONcore Edge, This is called a hot swap, To install the Edge Router module in an ONcore hub