This manual contains copyrighted material prepared by the Hewlett-Packard Co.

 

TM 11-6625-1614-15

TECHNICAL MANUAL

HEADQUARTERS

 

DEPARTMENT OF THE ARMY

No. 11-6625-1614-15)

W A S H I N G T O N , DC, 28 August 1 9 6 7

ORGANIZATIONAL, DS, GS, AND DEPOT MAINTENANCE MANUAL

HEWLETT–PACKARD ELECTRONIC VOLTMETER

 

 

 

MODEL 410C

 

 

 

(NSN

6625-00-969-4105)

 

Section

 

 

 

Page

I

GENERAL INFORMATION -------------------------------------------------------------------------------------------

1-1

 

1-A.1.

Scope --------------------------------------------------------------------------------------------------------

1-1

 

1-A.2.

Index of Publications ------------------------------------------------------------------------------------

1-1

 

1-A.3.

Maintenance Forms, Records, and Reports ---------------------------------------------------------

1-1

 

1-A.4.

Reporting Errors and Recommending Improvements --------------------------------------------

1-2

 

1-A.5.

Reporting Equipment Improvement Recommendations (EIR)---------------------------------

1-2

 

1-A.6.

Administrative Storage ----------------------------------------------------------------------------------

1-2

 

1-1.

Description -------------------------------------------------------------------------------------------------

1-4

 

1-4.

Accessories Available ------------------------------------------------------------------------------------

1-5

II

INSTALLATION ----------------------------------------------------------------------------------------------------------

2-1

 

2-1.

Inspection ---------------------------------------------------------------------------------------------------

2-1

 

2-3.

Installation -------------------------------------------------------------------------------------------------

2-1

 

2-5.

Rack Mounting --------------------------------------------------------------------------------------------

2-1

 

2-9.

Three - Conductor Power Cable ----------------------------------------------------------------------

2-1

 

2-12.

Primary Power Requirements --------------------------------------------------------------------------

2-1

 

2-14.

Repackaging for Shipment ------------------------------------------------------------------------------

2-2

III

OPERATION

---------------------------------------------------------------------------------------------------------------

3-1

 

3-1.

Introduction ------------------------------------------------------------------------------------------------

3-1

 

3-3.

Adjustment of Mechanical Zero----------------------------------------------------------------------

3-1

 

3-5.

Front and Rear Panel Description ---------------------------------------------------------------------

3-1

 

3-7.

Operating Procedures ------------------------------------------------------------------------------------

3-1

 

3-9.

DC Voltage Measurements (Figure 3-2)-------------------------------------------------------

3-1

 

3-11.

DC Current Measurements (Figure 3-3)-------------------------------------------------------

3-1

 

3-13.

AC Voltage Measurements (Figure 3-4)-------------------------------------------------------

3-1

 

3-15.

Precautions When Measuring AC Voltage ----------------------------------------------------

3-1

 

3-28.

Negative Pulses --------------------------------------------------------------------------------------------

3-4

 

3-31.

Measuring Resistance (Figure 3-7)--------------------------------------------------------------------

3-4

 

3-33.

Measuring DC Nano-Ampere Current (Figure 3-8)-----------------------------------------------

3-4

IV

THEORY OF OPERATION ---------------------------------------------------------------------------------------------

4-1

 

4-1.

Overall Description ---------------------------------------------------------------------------------------

4-1

 

4-4.

Circuit Description ---------------------------------------------------------------------------------------

4-1

 

4-5.

Input Network ---------------------------------------------------------------------------------------

4-1

 

4-16.

Modulator -

Demodulator ------------------------------------------------------------------------

4-1

 

4-23.

The Feedback Network ----------------------------------------------------------------------------

4-2

V

4-27.

Power Supply ----------------------------------------------------------------------------------------

4-2

MAINTENANCE ----------------------------------------------------------------------------------------------------------

5-1

 

5-1.

Introduction -----------------------------------------------------------------------------------------------

5-1

 

5-3.

Test Equipment Required -------------------------------------------------------------------------------

5-1

 

5-5.

Performance Checks -------------------------------------------------------------------------------------

5-1

Change i