Operation

WARNING

Pressurized Equipment Hazard

To reduce the risk of an injury, follow the Pressure Relief Procedure on page 20 whenever you are instructed to relieve the pressure.

1. Make sure the ES ON/OFF valve is OFF.

I ES O

ti1273a

2. Turn on the main air supply valve (B).

4. Fully open the fan air adjustment valve.

0 KV 100%

μα

HI

LO ES

I ES O

ti1269a

5. Fully open the fluid adjustment valve.

0 KV 100%

μα

HI

LO ES

I ES O

ti1267a

6. Fully open the atomizing air restrictor valve.

3. Position the air cap by loosening the air cap retaining ring, and rotating the air cap for a vertical or horizontal spray pattern. Tighten the retaining ring until the air cap is held firmly in place; you should not be able to rotate the air cap horns by hand.

ti1272a

Vertical Pattern

7. Make sure the ES ON/OFF valve is OFF.

I ES O

Horizontal Pattern

ti1273a

22

309293J